40 KVA Three-Phase UPS (Uninterruptible Power Supply) DR Congo
The scope, dates and status of this tender. A free account opens every field.
Source: DevelopmentAid
Tender
Open
40 KVA Three-Phase UPS (Uninterruptible Power Supply) DR Congo
- Status
- Bidding
- Sector
- Power Generation (CCGT)
- Location
- Democratic Republic of the Congo
- Updated
- 3 Nov 2026
- Source
- DevelopmentAid
ConstructChat
Ask ConstructChat about 40 KVA Three-Phase UPS (Uninterruptible Power Supply) DR Congo
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Tender Information FAQ
Tender Information
3 Q
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 40 KVA Three-Phase UPS (Uninterruptible Power Supply) DR Congo |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | DevelopmentAid |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Dem. Rep. Congo
- Sustainable Emergency Back-up Power for Various Locations - South/East Africa
- Access Governance & Reform for the Electricity and Water Sectors Project: Les études APS, APD et DAO des travaux de construction du 4è module de production d’eau potable de 110.000 m3/jour de Ndjili, construction de nouveau captage sur le fleuve Congo et 2è module de LUKUNGA
- Access Governance & Reform for the Electricity and Water Sectors Project: Construction de la première phase (75 000 m3/jour) de l’usine de traitement d’eau potable basée sur le captage à la rivière LULUA, y compris pose de conduites d'adduction, de refoulement et/ou construction des réservoirs de stockage à Kananga
- Access Governance & Reform for the Electricity and Water Sectors Project: Réhabilitation et renforcement de l’usine de traitement d’eau potable de Kanyuka (50 000 m3/jour) et du captage Tshibashi, y compris la pose de conduites d'adduction et/ou de refoulement à Kananga
- Access Governance & Reform for the Electricity and Water Sectors Project: Fourniture et pose des conduites de distribution d'eau et exécution des branchements particuliers à KANANGA
- Access Governance & Reform for the Electricity and Water Sectors Project: Recrutement d'un Consultant chargé du contrôle et de la surveillance des travaux de de construction d'un bâtiment pour ARE, ANSER, ARSPE, UCM, CEPO et SG MRHE à Kinshasa
- Repatriation of utility Material by sea from Monusco Bunia, DR Congo to Bangladesh
- Access Governance & Reform for the Electricity and Water Sectors Project: Recrutement d’un spécialiste en santé et sécurité au travail pour le compte de la CEP-O
