45-48 Pill Gardens, Braunton - Demolition of 4 Dwellings
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
The contract covers the complete demolition and removal of all existing structures at 45-48 Pill Gardens, Braunton, including hard and soft landscaping, substructures, and all associated spoil. Works will be carried out under a JCT Minor Works 2024 contract, with demolition commencing in February 2026. The contractor will be responsible for providing a full programme of works, a detailed contract
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about 45-48 Pill Gardens, Braunton - Demolition of 4 Dwellings
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contract covers the complete demolition and removal of all existing structures at 45-48 Pill Gardens, Braunton, including hard and soft landscaping, substructures, and all associated spoil. Works will be carried out under a JCT Minor Works 2024 contract, with demolition commencing in February 2026. The contractor will be responsible for providing a full programme of works, a detailed contract sum analysis, and the safe removal and disposal of asbestos in accordance with the Refurbishment & Demolition Surveys. All spoil must be removed from site, with the contractor ensuring lawful disposal and undertaking all required testing. A Construction and Environmental Management Plan must also be prepared to satisfy Planning conditions. Site requirements include managing levels and gradients, installation of UPVC hoarding, and provision of temporary works design, with value‑engineering options considered. Contractors must ensure safe coordination with ecologists, and verify disconnections of all utility services before excavation. They must also undertake their own demolition checks, ensure no underground service conflicts, and submit the required Section 80 notice. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United Kingdom
- PEACEPLUS - Annadale Embankment Open Space
- Somer Valley PM Consultany
- Weyside Urban Village - Phase 4 Enabling Works and Infrastructure
- Road Vehicle Maintenance
- DLR Thamesmead Extension Water Utility Studies Tranche One
- Alley Gating Repair and Maintenance
- PS26239 - RAF015/2627 - Plug-in batteries safety study
- MK4 Shore supply
