logo

46225 Grace Lake Rd , Sandstone IHS Septic

The scope, dates and status of this tender. A free account opens every field.

Source: Minnesota Purchasing Group

Tender
Closed

Contractor shall provide all equipment , materials and labor to complete the work described or referenced in this rfp , provided 2025 MLB Spec Book , MN Chapter 7080 , HIS Section 01270 and within the provided Environmental Systems design . 1 . Replace the on - site septic system per the approved septic design

Status
Closed
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about 46225 Grace Lake Rd , Sandstone IHS Septic

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “46225 Grace Lake Rd , Sandstone IHS Septic” is a tender record in Taiyo. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Contractor shall provide all equipment , materials and labor to complete the work described or referenced in this rfp , provided 2025 MLB Spec Book , MN Chapter 7080 , HIS Section 01270 and within the provided Environmental Systems design . 1 . Replace the on - site septic system per the approved septic design provided by Environmental Systems dated 7 / 5 / 23 . Contractor shall ensure a complete and functional system . Note : this design was “ renewed ” by the designer on 10 / 24 / 25 per provided letter . 2 . The contractor shall have the existing septic tank pumped and filled or crushed . Contractor shall assume existing tank hold up to 2 , 500 gallons . Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator . 3 . Contractor shall be responsible for contacting the I . H . S . Engineer and Carla Dunkley , Project Manager , a minimum of 48 hour notice before starting the installation to schedule project site visits to see scratch , tanks and rock bed before covering . 4 . Contractor shall provide an As - Built System drawing for submission to MLBO . 5 . Contractor will not receive final payment until IHS has completed a successful final inspection and any punch list items from the Owner or I . H . S . Engineer have been completed ; and Owner has been supplied with full lien waivers for all subcontractors and suppliers . 6 . Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080 . 7 . Contractor shall follow proper MN Chapter 7080 mound prep procedure , keeping traffic off the designated mound area . Contractor shall be responsible for the cost of any : compaction testing ; re - design fees ; or additional costs associated with system redesign or relocation ; if these expenses are incurred due to contractor or subcontractor damaging the mound location . 8 . Contractor shall provide and install Polylok PL122 filter with alarm per design . 9 . Contractor shall provide and install flow meter & alarm per design : SJE Rhombus model : EZP11W6COH1JV8G10EP17A22C ...

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender