54--Ia-Neal Smith Nwr-Temp Modular Office
Sector: Commercial • Location: United States of America
Source: SAMGOVCO
IA - Temp Modular Office Space approx. 36X56 Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For
- Status
- Closed
- Sector
- Commercial, Cement, Car parking, Manufacturing (Industrial), Residential, Automotive, Road
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAMGOVCO
ConstructChat
Ask ConstructChat about 54--Ia-Neal Smith Nwr-Temp Modular Office
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | IA - Temp Modular Office Space approx. 36X56 Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For questions and to submit your packet, email robert_sung@ios.doi.gov with "140F0S26Q0051" in the subject line Additional RFI item: Q: The maintenance yard that this modular building is to be located shows a gravel surface. Unless ADA requirements changed this month, that would not be an acceptable surface for a ramp. Asphalt or concrete, or a solid, smooth surface is needed. Is a ramp needed as I¿m not seeing anything that indicates a handicap parking area is needed for the ramp to terminate? A: ADA and ABA require level and slip-resistant landings that are free of obstructions. Compacted gravel meets this requirement. Provide accessible ramps per the scope of work. Q: Is low voltage wiring required for phone/data? A: Yes Q: Will office furniture be needed? A: No. Q: When is the expected move in date acceptance of the office space 11/30/26. Contract will start on 11/30/26, but can be adjusted as needed. Temporary office space is expected to be fully set (utilities) up on date the contract starts. NOTE: Vendor is no longer required to submit mockups, however Floor plans/drawings and a written description is required. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAMGOVCO |
URL |
More Details
Record type | Tender |
Sector | Commercial, Cement, Car parking, Manufacturing (Industrial), Residential, Automotive, Road |
Article published date | 2026-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
