logo

56--Nv-Stillwater Nwrc-Hunter Rd Gravel Proj

Sector: Government • Location: United States of America

Source: SAM.gov

Tender
Solicitation

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. The Government has $560,042.96. The vendor is requested to update th

Status
Closed
Sector
Government, Oil and Gas, Road, Commercial, Residential
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about 56--Nv-Stillwater Nwrc-Hunter Rd Gravel Proj

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “56--Nv-Stillwater Nwrc-Hunter Rd Gravel Proj” is a tender record in Taiyo, linked to the Government sector. It is issued for works, goods, or services related to United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. **AMENDMENT 2, Update** The Government has $560,042.96. The vendor is requested to update their quotes to provide the quantity of stone that can be provided for this amount. ********** Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.

Original sector

Mining, Quarrying, and Oil and Gas Extraction

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Government, Oil and Gas, Road, Commercial, Residential

Article published date

2026-02-24

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender