logo

656-22-341 Conduct Substation Upgrade

Sector: Cement • Location: Saint Cloud, Minnesota, United States of America

Source: SAM.gov

Tender
Solicitation

Base Project: The Contractor shall furnish all labor, materials, tools and equipment required to: Remove and replace two large 5000KVA utility grade transformers with two 6000 KVA utility grade transformers. Remove and replace a total of 16 smaller medium voltage transformers in the range of 30 KVA to 750 KVA. Provide passive, anti-ram rated bollards in accordance with ASTM F2656 crash rating requ

Status
Prospective
Sector
Cement, Power Transmission, Power Generation (CCGT), Commercial, Residential
Location
Saint Cloud, Minnesota, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about 656-22-341 Conduct Substation Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “656-22-341 Conduct Substation Upgrade” is a tender record in Taiyo, linked to the Cement sector. It is issued for works, goods, or services related to Saint Cloud, Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Base Project: The Contractor shall furnish all labor, materials, tools and equipment required to: Remove and replace two large 5000KVA utility grade transformers with two 6000 KVA utility grade transformers. Remove and replace a total of 16 smaller medium voltage transformers in the range of 30 KVA to 750 KVA. Provide passive, anti-ram rated bollards in accordance with ASTM F2656 crash rating requirements (minimum M30/P1 or as directed by VA), installed per Specification Section 34 71 13. Bollards shall be placed a minimum of 3 feet from transformer pads, spaced no more than 5 feet apart, and removable where located within electrical working clearances, designed per project drawings. Replace transformer pads, where required, with new pads meeting 4000 psi concrete strength and reinforcement per EK501 detail in the drawings. All work completed in accordance with the specifications and contract drawings. Deducts: Bid Item I: (Alternate Deduct 1) 886 Calendar Days All Work of Bid Item I, less work to provide and install Transformer TF-50, as follows: Delete the furnishing and installation of install Transformer TF-50 as specified and indicated on the drawings.

Original sector

Construction

Location

Country

United States of America (USA)

State

Minnesota

City

Saint Cloud

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Cement, Power Transmission, Power Generation (CCGT), Commercial, Residential

Article published date

2026-04-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender