logo

6th Ward ADA Ramps Project

Closed · Montana · Last reported Mar 2026

Source: Montana Purchasing Group

Tender
Closed

The scope of work for the project includes : 1 . Replace or install ADA / PROWAG compliant curb - ramp corners for all Priority 1 and Priority 2 locations , by 30 June 2026 . Construction of as many ADA / PROWAG compliant curb - ramp corners as possible per the remaining project budget , based on priority ( see

Status
Closed
Sector
Road, Water Supply and Storage, Car parking, Cement, Automotive
Location
Montana, United States of America
Updated
3 Nov 2026
Source
Montana Purchasing Group

ConstructChat

Ask ConstructChat about 6th Ward ADA Ramps Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “6th Ward ADA Ramps Project” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Montana, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The scope of work for the project includes : 1 . Replace or install ADA / PROWAG compliant curb - ramp corners for all Priority 1 and Priority 2 locations , by 30 June 2026 . Construction of as many ADA / PROWAG compliant curb - ramp corners as possible per the remaining project budget , based on priority ( see Attachment “ A ”) by 02 October 2026 . 2 . Installation of transition sidewalk panel ( s ) from new landings to existing sidewalk . 3 . Where required , with written approval , remove and replace extra curb & gutter for better asphalt transition . 4 . New sidewalk shall meet the existing sidewalk with a clean , straight sawcut and 1 / 2 - inch expansion joint material . 5 . Unit pricing will be based solely on double , single , or blended transition ramp corners as complete units ( see Attachment “ B ”). Assume replacement of entire corner including curb & gutter and fillet as described in the proposal unit specifications ( see Attachment “ C ”). Unit prices include furnishing all necessary labor , materials and equipment required to complete and protect the work performed . 6 . All work shall be done in accordance with City of Helena Engineering Standards , Montana Public Works Standard Specifications ( MPWSS ) and comply with PROWAG guidelines . 7 . City Transportation Systems Department must be notified when forms are set to allow for field review before any concrete is placed . 8 . Any cold - weather concrete placement must be pre - approved , and all related extra costs will be incidental to sidewalk repair / replacement work , no other compensation will be allowed . 9 . The Contractor is responsible for furnishing , installing , maintaining , relocating , and removing temporary traffic control devices for regulating , warning , or directing vehicle and pedestrian traffic during construction . A typical Traffic Control Plan in compliance with Manual on Uniform Traffic Control Devices ( MUTCD ) guidance must be submitted with executed contract . All traffic / pedestrian controls shall be placed in accordance with MUTCD Standards prior to commencing work . Traffic control is incidental to the sidewalk repair / replacement work , no other compensation will be allowed . 10 . Any irrigation and / or landscape repair / replacement will be incidental to sidewalk repair / replacement work , no other compensation will be allowed . Landscaping to match original with minimum 6 ” of topsoil and matching vegetation . Removed grass to be replaced with sod . 11 . Any and all storm water Best Management Practices ( BMPs ) including erosion control will be incidental to the sidewalk repair / replacement work , no other compensation will be allowed . 12 . Wherever tree roots are encountered under or directly adjacent to the corner , the City Arborist must be consulted to decide if the roots may be cut and removed . If root removal is required , the cost for such work shall be considered incidental to the sidewalk installation , no other compensation will be allowed . If tree removal is required , that removal will be coordinated with the City and the responsibility of the removal lies with the City . 13 . City will inspect all new ramps and record compliance with PROWAG on a Curb Ramp Inventory Sheet for acceptance , ( see Attachment “ C ”)

Location

Country

United States of America (USA)

State

Montana

Source

Source

Montana Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Car parking, Cement, Automotive

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender