700201 - CFRR Grieco Water Development
Sector: Solar • Location: Montana, United States of America
Source: Montana Purchasing Group
The Montana Natural Resource Damage Program ( NRDP ) in cooperation with the Grieco Family Limited Partnership is working to develop a stock water system which will use an existing well to provide water to a water storage tank as well as five stock water tanks on the Clark Fork River Ranch and adjoi
- Status
- Closed
- Sector
- Solar, Water Supply and Storage, Power Generation (CCGT)
- Location
- Montana, United States of America
- Updated
- 3 Nov 2026
- Source
- Montana Purchasing Group
ConstructChat
Ask ConstructChat about 700201 - CFRR Grieco Water Development
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Montana Natural Resource Damage Program ( NRDP ) in cooperation with the Grieco Family Limited Partnership is working to develop a stock water system which will use an existing well to provide water to a water storage tank as well as five stock water tanks on the Clark Fork River Ranch and adjoining Grieco Ranch . NRDP seeks a contractor to complete a stock water system as described in the Special Provisions and Drawings . Work will include but not be limited to furnishing and installing a new well pump , drop pipe , valving , solar power system to power the well , pipeline , stock tanks , water storage tank , and fencing . Contractor is required to furnish and install the system to a new solar power supply and complete the earthwork necessary for the water development infrastructure . Coordination with the landowner will be paramount during construction to manage cattle , coordinate access , and ensure public and private land and fencing remain in acceptable condition during and after construction . Most of the water infrastructure components , structures , and equipment shall be designed or selected by the Contractor to meet the performance requirements in these Contract Documents . The Contractor is solely responsible for ensuring equipment and the complete Water Development system meets the performance requirements , works as intended , and for providing required documentation of their design . The Work is contingent on the execution of an access agreement found in Appendix B ; Grieco Family Limited Partnership |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Solar, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Solar tenders in United States of America
- Software For Renewable Energy Storage Monitoring Services
- Sunol Valley Water Treatment Plant Ozonation
- Sunol Long Term Improvements - Alameda Creek Watershed Cente...
- CANCELLED - Alameda Creek Recapture
- Design-Build Services for San Joaquin Valley Communication S...
- General Building (B License) Construction, San Francisco, Sa...
- Request for Proposals for Scope III, Bid Solicitation 3, Sou...
- City Distribution Division Campus at 2000 Marin [Minimum Qua...
