740 ' x 6 ' Mono Lake ADA boardwalk kit inclusive of hardware
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
Contractor to provide materials for the replacement of the Mono Lake ADA boardwalk trail . Boardwalk materials to be composed of fiber reinforced polymer ( FRP ) composite materials and manufactured using continuous ECR glass fiber and vinyl ester resin . All structural members will have non - woven polyester veil
- Status
- Closed
- Sector
- Steel, Manufacturing (Industrial), Rail, Cement
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about 740 ' x 6 ' Mono Lake ADA boardwalk kit inclusive of hardware
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Contractor to provide materials for the replacement of the Mono Lake ADA boardwalk trail . Boardwalk materials to be composed of fiber reinforced polymer ( FRP ) composite materials and manufactured using continuous ECR glass fiber and vinyl ester resin . All structural members will have non - woven polyester veil applied during the manufacturing process . Due to strict scenic corridor constraints and a high alkaline and UV exposure environment , FRP materials must be painted in a two - part fluoropolymer coating such as Vitreflon or approved equal and must be RAL 080 - 30 - 26 ( Smoked Oak ) in color . The boardwalk required is 740 lineal feet and 6 feet width outside to outside . Decking required is to be 38mm mini - mesh decking with anti - slip surface and in panels 4 feet by 6 feet by 1 . 5 inches thick . Bull rail edging to attach flush with outside of decking for total of 6 - foot - wide decking surface . Hardware and brackets to be stainless steel and provided in full to connect all boardwalk materials directly to concrete Diamond Pier foundation , provided by Parks , and construct entire boardwalk structure . Due to sensitive wetland environment , spans between Diamond Pier foundations need to be 20 foot and engineered for 100 psi live load . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Manufacturing (Industrial), Rail, Cement |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...
