746-26-376-AC - Orakei Basin Boardwalk - ECI and Construction
Sector: Steel • Location: New Zealand
Source: New Zealand Government Electronic Tenders Service (GETS)
Orakei Basin Boardwalk, a key connection in the Glen Innes to Tamaki cycle way, is located along the Northern end of the Orakei Basin, along a double-tracked rail embankment, inside the KiwiRail rail corridor.The boardwalk was originally built in 2009 and widened in 2018/19. When the boardwalk was widened, the deck was replaced over the full width, but the substructure from 2009 remained. In 2020,
- Status
- Closed
- Sector
- Steel, Mass Transit, Manufacturing (Industrial), Bridge, Rail, Road, Commercial, Government
- Location
- New Zealand
- Updated
- 3 Nov 2026
- Source
- New Zealand Government Electronic Tenders Service (GETS)
ConstructChat
Ask ConstructChat about 746-26-376-AC - Orakei Basin Boardwalk - ECI and Construction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Orakei Basin Boardwalk, a key connection in the Glen Innes to Tamaki cycle way, is located along the Northern end of the Orakei Basin, along a double-tracked rail embankment, inside the KiwiRail rail corridor.The boardwalk was originally built in 2009 and widened in 2018/19. When the boardwalk was widened, the deck was replaced over the full width, but the substructure from 2009 remained. In 2020, the handrails were replaced after feedback from the community. At the eastern end of the boardwalk, there is a bridge that spans across the spillway for the sluice gates.The boardwalk is used by over 1,300 users per day and there is no easy alternative route. It is a well-loved and highly appreciated asset to the community and to commuters to and from the CBD.Recent inspections of the boardwalk have identified displacement of the handrails on the eastern end along the railway side of the boardwalk. Following further investigation, it was found that the piles under the old (2009) section of boardwalk had decayed and been significantly affected by teredo worm – to the point that some piles no longer support the structure.A 2.5m wide, 230m long section of the boardwalk has subsequently been cordoned off as a safety precaution pending implementation of a remedial solution.Stage 4 of the Glen Innes to Tamaki cycleway has commenced to the west of Orakei Basin (Section 4 – Orakei to Tamaki Drive) and when that is completed in Q4 of 2026, this will complete the full cycleway from Glen Innes to Tamaki Drive.It is therefore essential that the proposed construction methodology for Section 3 remedial works:• Completes all works prior to Stage 4 go-live.• Maintains continuous public access along the cycle way during the Stage 3 worksAn ECI model is proposed as there is a need for:• constructability advice for the final stages of design, particularly focussed on the design of boardwalk foundation system and substructure elements.• need for early procurement of some long lead time items (i.e. significant number of steel piles which may need to be procured overseas).• support required for consenting, stakeholder management and programming to meet the time constraints and coordination across multiple sites. |
Location
Country | New Zealand |
Source
Source | New Zealand Government Electronic Tenders Service (GETS) |
URL |
More Details
Record type | Tender |
Sector | Steel, Mass Transit, Manufacturing (Industrial), Bridge, Rail, Road, Commercial, Government |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in New Zealand
- 25 027 Bunnythorpe Filter and UV Installation
- Nelson City Council - Maitai Flood Improvements - Area 1 - Pkg1 - RFT - 24Nov2025
- Ross Swimming Pool Renovation 25-26-06
- Ross Swimming Pool Renovation 25-26-06
- 13740 SH43 Retaining Walls 2026
- 13740 SH43 Retaining Walls 2026
- CON25029 - Reyburn Street Bridge Strengthening
- Te Kura Mana Māori o Whangaparaoa - Main Contractor for Site Wide Remediation Works
