7G20--Fy26 Nrm - Install Analog Phone Line To Building 6 - 610A4-26-510
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
This is a total small business (SB) set aside . The agency seeks information from interested, eligible, and qualified small businesses for execution of this project. Proposals are being requested or accepted at this time. This is a solicitation, and a contract will be awarded based on this synopsis. Please see the notices below and follow the information on the SF1442. THE PROJECT REQUIREMENTS: Th
- Status
- Prospective
- Sector
- Telecommunications, Residential, Commercial
- Location
- Fort Wayne, Indiana, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about 7G20--Fy26 Nrm - Install Analog Phone Line To Building 6 - 610A4-26-510
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This is a total small business (SB) set aside . The agency seeks information from interested, eligible, and qualified small businesses for execution of this project. Proposals are being requested or accepted at this time. This is a solicitation, and a contract will be awarded based on this synopsis. Please see the notices below and follow the information on the SF1442. THE PROJECT REQUIREMENTS: The contractor will provide all labor, equipment, materials, and supervision required to furnish and install cabling to reconnect the pedestrian blue call pole communication line between Buildings 3 and 6 to the VA system at 2121 Lake Avenue, Fort Wayne, IN 46805. I. SPECIFIC: To include: Remove the old cable that is being replaced. Install a new 25-pair CAT 3 cable from the OIT Telecommunication Room in the basement of Building 3 to the basement of Building 6, approximately 700 feet in length Terminate all pairs of the new cable at both ends, connecting to the existing 100-pair Building Entrance Protect in Building 3 and the 66-block in Building 6 The cable pathway between buildings will use the existing duct bank, which includes multiple permitted confined-space underground access vaults for cable installation Firestopping material in the OIT Telecommunication Room must be removed to install the cable and then properly restored The period of performance is 60 days after signed notice to proceed. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fort Wayne |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Telecommunications, Residential, Commercial |
Article published date | 2026-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
