logo

8931 Eyota Way , Onamia Bathroom Remodel

One of 9,043 tenders Taiyo tracks in Minnesota.

Source: Minnesota Purchasing Group

Tender
Closed

1 . Demo the existing tub / shower and shower trim kit . Demo and remove all sheetrock on ceiling and walls . Remove floor tile and install new underlayment backer board to accept new VLT . Include dumpster , hauling and disposal fees . 2 . Supply and install Flexstone Royale Alcove Shower Surround Kit for ope

Status
Closed
Sector
Water Supply and Storage, Mass Transit, Tunnel, Residential
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about 8931 Eyota Way , Onamia Bathroom Remodel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “8931 Eyota Way , Onamia Bathroom Remodel” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Demo the existing tub / shower and shower trim kit . Demo and remove all sheetrock on ceiling and walls . Remove floor tile and install new underlayment backer board to accept new VLT . Include dumpster , hauling and disposal fees . 2 . Supply and install Flexstone Royale Alcove Shower Surround Kit for openings up to ( approximate ) ( GENERAL CONTRACTOR WILL VERIFY ACTUAL SIZE ) 60 ” W x 32 ” D x 80 ” H . Include supply and install ( 2 ) 15 inch corner shelves . Supply and install Flexstone single threshold shower base with correct sided drain opening . All component color and finish to be selected by “ ELDER ”. Contractor shall include all materials and labor necessary for installation per manufacturer ’ s instructions , including but not limited to the shower drain and backer boards for walls . Contractor is responsible for field measuring to ensure that new tub fits in the opening without leaving a gap in the flooring at shower edge . 3 . Include all new wall and ceiling sheetrock . 4 . Provide new classic white subway tile and installation on entire exposed sheetrock wet wall adjacent toilet and sink . 5 . Provide and install all new wood base on bathroom flooring . 6 . Contractor shall supply and install plywood backer for the shower surround and grab bars . 7 . Contractor shall include all costs associated with moving plumbing to align with the new shower . 8 . Re - use existing vanity . Provide and install new faucet complete with new sink in like quality . 9 . Remove all flooring and provide and install new Home Depot Lifeproof 22 mil VL Plank flooring . Replace any water damaged structural sub - floor and underlayment . Repair and replace up to ( 2 ) 4 x 8 foot sheets as necessary . 10 . Contractor shall include all costs associated with adjusting the opening to fit the new shower . Shower shall fit without leaving a gap in the flooring at shower edge .

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Mass Transit, Tunnel, Residential

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender