A9(T) Tore Modelling
Awarded · Scotland
Source: Public Contracts Scotland
Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and inc
- Status
- Closed
- Sector
- Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Public Contracts Scotland
ConstructChat
Ask ConstructChat about A9(T) Tore Modelling
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing.The study took a holistic view of the corridor’s current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock.Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction.Building on the previous modelling work, the next phase aims to update or expand the analysis to assess:- The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area.- The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout.- The potential implications at the junctions between Munlochy/ North Kessock and Tore itself.The updated study will evaluate:- Traffic flow along the A9(T)- Local access and connectivity for Tore residents- Broader network performance and journey times- The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself.CPV: 90712100, 71410000, 71240000, 90712000, 30196000. |
Location
Country | United Kingdom (UK) |
Source
Source | Public Contracts Scotland |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-08-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
