Abatement , Demolition & Site Restoration - First Link
Bids closed Apr 2026 · Kentucky · Last reported Apr 2026
Source: Kentucky Purchasing Group
Specifications include , but are not limited to : Permits Notifications , and Coordination - The Contractor shall : • Obtain all required demolition , abatement , and related permits . • File all required regulatory notifications , including but not limited to asbestos and demolition notifications . • Coordinate activities with L
- Status
- Closed
- Sector
- Waste Processing and Treatment, Mass Transit, Government, Power Transmission, Power Generation (CCGT)
- Location
- Kentucky, United States of America
- Updated
- 3 Nov 2026
- Source
- Kentucky Purchasing Group
ConstructChat
Ask ConstructChat about Abatement , Demolition & Site Restoration - First Link
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Specifications include , but are not limited to : Permits Notifications , and Coordination - The Contractor shall : • Obtain all required demolition , abatement , and related permits . • File all required regulatory notifications , including but not limited to asbestos and demolition notifications . • Coordinate activities with Louisville / Jefferson County Metro Government , the Kentucky Energy and Environment Cabinet ( including the Division of Waste Management ), other applicable regulatory agencies and utility providers as required . • Develop and implement a site ‑ specific safety plan in compliance with OSHA requirements and applicable regulations All permits , notifications , and approvals shall be documented and made available to LMHA upon request . Regulatory compliance documentation may be reviewed by LMHA and its environmental consultant or construction manager , as applicable , to confirm compliance . Site Controls and Mobilization – Prior to demolition , the Contractor shall : • Install fencing , access controls , signage , and barriers sufficient to secure the site and protect the public . • Implement dust suppression , erosion control , and stormwater protection measures as necessary . i ) The Contractor shall be responsible for installation , maintenance , and repair of all erosion and sediment control measures for the duration of the Work . • Coordinate pest and rodent control measures prior to disturbance . |
Location
Country | United States of America (USA) |
State | Kentucky |
Source
Source | Kentucky Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Mass Transit, Government, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
