ABSD - BOILER & HOT WATER PUMP UPGRADES PHASE 2
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
The intent of this Scope of Work and any attached supporting documentation including any applicable addenda ( e . g . stamped drawings / documentation ) is to provide the Subcontractor with general conformance guidelines . Subcontractor shall be responsible for performing any / all applicable site investigation to ensure t
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about ABSD - BOILER & HOT WATER PUMP UPGRADES PHASE 2
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The intent of this Scope of Work and any attached supporting documentation including any applicable addenda ( e . g . stamped drawings / documentation ) is to provide the Subcontractor with general conformance guidelines . Subcontractor shall be responsible for performing any / all applicable site investigation to ensure that the desired results are achieved . In this case , the desired results are : o Replacing existing boiler ( s ) and hot water pump ( s ) by providing and installing new sealedcombustion high efficiency boiler ( s ) and hot water pump ( s ) necessary to improve heating system efficiency within the buildings identified in Table 1 . Existing Equipment Schedule - Boilers and Hot Water Pumps and accompanying MEP drawing sets . o In the replacement of equipment , Subcontractor shall ensure that new equipment installed meets the existing performance characteristics illustrated in Table 1 unless otherwise specified : ▪ Input capacities ▪ Flow rate ( GPM ) ▪ Pump head ( Ft ) ▪ Electrical characteristics o Subcontractor shall perform the following pre - installation activities to verify existing system characteristics : ▪ Testing , adjusting , balancing ( TAB ) with accompanying report to validate hot water pump ( s ) design characteristics / performance ( e . g . pump head / pressure , GPM , Motor RPM , Motor Voltage / Amps / Phasing ) and validate that all nameplate information on existing equipment accurately matches the information provided in Exhibits B , C , D , and E prior to submittals and / or ordering equipment . ▪ In the following locations where Propylene glycol is currently used in the heating system testing concentration and quality of Propylene glycol in the heating system with accompanying report . ▪ Propylene glycol used directly in entire heating system : ▪ Middle School North ( Qty 4 Boilers ) ▪ Middle School South ( Qty 2 Boilers ) ▪ Propylene glycol used in secondary heating system , heated through a plate & frame heat exchanger : ▪ Ashley Elementary School ▪ Naldrett Elementary School o Subcontractor shall obtain all necessary applicable permits and approvals prior to commencement of scope of work . o Subcontractor shall provide all necessary labor and materials for complete implementation of boiler ( s ) and hot water pump ( s ) system and proper disposal of removed equipment ( not using owner ' s dumpsters and / or owner ' s refuse containers ). o Unless otherwise specified , point of new connection to be existing isolation valves for boiler ( s ) and hot water pump ( s ). o Subcontractor shall provide and receive submittal approval prior to ordering any materials associated with this scope of work . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
