logo

ABSD - BOILER & HOT WATER PUMP UPGRADES PHASE 2

Closed · MITN · Last reported Feb 2026

Source: MITN Purchasing Group

Tender
Closed

The intent of this Scope of Work and any attached supporting documentation including any applicable addenda ( e . g . stamped drawings / documentation ) is to provide the Subcontractor with general conformance guidelines . Subcontractor shall be responsible for performing any / all applicable site investigation to ensure t

Status
Closed
Sector
Water Supply and Storage
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about ABSD - BOILER & HOT WATER PUMP UPGRADES PHASE 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “ABSD - BOILER & HOT WATER PUMP UPGRADES PHASE 2” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The intent of this Scope of Work and any attached supporting documentation including any applicable addenda ( e . g . stamped drawings / documentation ) is to provide the Subcontractor with general conformance guidelines . Subcontractor shall be responsible for performing any / all applicable site investigation to ensure that the desired results are achieved . In this case , the desired results are : o Replacing existing boiler ( s ) and hot water pump ( s ) by providing and installing new sealedcombustion high efficiency boiler ( s ) and hot water pump ( s ) necessary to improve heating system efficiency within the buildings identified in Table 1 . Existing Equipment Schedule - Boilers and Hot Water Pumps and accompanying MEP drawing sets . o In the replacement of equipment , Subcontractor shall ensure that new equipment installed meets the existing performance characteristics illustrated in Table 1 unless otherwise specified : ▪ Input capacities ▪ Flow rate ( GPM ) ▪ Pump head ( Ft ) ▪ Electrical characteristics o Subcontractor shall perform the following pre - installation activities to verify existing system characteristics : ▪ Testing , adjusting , balancing ( TAB ) with accompanying report to validate hot water pump ( s ) design characteristics / performance ( e . g . pump head / pressure , GPM , Motor RPM , Motor Voltage / Amps / Phasing ) and validate that all nameplate information on existing equipment accurately matches the information provided in Exhibits B , C , D , and E prior to submittals and / or ordering equipment . ▪ In the following locations where Propylene glycol is currently used in the heating system testing concentration and quality of Propylene glycol in the heating system with accompanying report . ▪ Propylene glycol used directly in entire heating system : ▪ Middle School North ( Qty 4 Boilers ) ▪ Middle School South ( Qty 2 Boilers ) ▪ Propylene glycol used in secondary heating system , heated through a plate & frame heat exchanger : ▪ Ashley Elementary School ▪ Naldrett Elementary School o Subcontractor shall obtain all necessary applicable permits and approvals prior to commencement of scope of work . o Subcontractor shall provide all necessary labor and materials for complete implementation of boiler ( s ) and hot water pump ( s ) system and proper disposal of removed equipment ( not using owner ' s dumpsters and / or owner ' s refuse containers ). o Unless otherwise specified , point of new connection to be existing isolation valves for boiler ( s ) and hot water pump ( s ). o Subcontractor shall provide and receive submittal approval prior to ordering any materials associated with this scope of work .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender