Active Vehicle Barriers And Associated Control System At Osan Air Base
Sector: Aerospace & Defense • Location: United States of America
Source: SAM.gov
The amendment 0003 is issued to extend the closing date from 26 OCT 2026 to 4 NOV 2026, 1300 Hrs (KST).// The amendment 0002 is issued to extend the closing date from 15 OCT 2026 to 29 OCT 2026, 1300 Hrs (KST). //The amendment 0001 is issued to extend the closing date from 1 OCT 2026 to 15 OCT 2026, 1300 Hrs (KST). //This pre solicitation is conducted under the logistic cost sharing (LCS) program.
- Status
- Prospective
- Sector
- Aerospace & Defense, Warehouse, Metal, Power Generation (CCGT), Manufacturing (Industrial), Residential, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Active Vehicle Barriers And Associated Control System At Osan Air Base
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The amendment 0003 is issued to extend the closing date from 26 OCT 2026 to 4 NOV 2026, 1300 Hrs (KST).// The amendment 0002 is issued to extend the closing date from 15 OCT 2026 to 29 OCT 2026, 1300 Hrs (KST). //The amendment 0001 is issued to extend the closing date from 1 OCT 2026 to 15 OCT 2026, 1300 Hrs (KST). //This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Warehouse, Metal, Power Generation (CCGT), Manufacturing (Industrial), Residential, Commercial |
Article published date | 2026-10-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in United States of America
- Indigent Defense Services for Misdemeanor Cases Public Defender
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- NonExclusive Airport Rental Car Concession
- Procurement Consulting Services
