ADAIR COUNTY BRIDGE WORK AT THREE LOCATIONS ON BNSF RAILWAY LINES
One of 10,000+ tenders Taiyo tracks in Missouri.
Source: Missouri Purchasing Group
The project consists of three separate sites . Site 1 : Cranberry Lane over BNSF Railways will consist of the removal of an existing multi - span wood and steel bridge over an active railway , and the construction of a new 184 ’ long single - span modern pre - engineered steel truss including a reinforced con
- Status
- Closed
- Sector
- Mass Transit, Road, Rail, Power Transmission, Power Generation (CCGT), Bridge, Steel, Cement
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about ADAIR COUNTY BRIDGE WORK AT THREE LOCATIONS ON BNSF RAILWAY LINES
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project consists of three separate sites . Site 1 : Cranberry Lane over BNSF Railways will consist of the removal of an existing multi - span wood and steel bridge over an active railway , and the construction of a new 184 ’ long single - span modern pre - engineered steel truss including a reinforced concrete deck , concrete barrier rail , chain link fence , guardrail , earthwork , drilled shafts , concrete abutments , rock blanket , roadway construction , traffic control , erosion control , utility relocation , and all appurtenances . Site 2 : Titan Lane over BNSF Railways will consist of the removal of an existing multi - span wood and steel bridge over an active railway and the permanent closure of the crossing including earthwork , erosion control , guardrail , traffic control , and all appurtenances . Site 3 : Columbus Lane over Big Deer Branch will consists of the construction of a 12 ’ x 50 ’ single cell concrete box culvert near BNSF Railways , earthwork , rock blanket , roadway construction traffic control , erosion control , and all appurtenances . The project is funded through BNSF Railways . Interim financing as reimbursement payments from BNSF are processed shall be incidental to the project . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Mass Transit, Road, Rail, Power Transmission, Power Generation (CCGT), Bridge, Steel, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Mass Transit tenders in United States of America
- Regional Parks Fire Fuel Reduction Work
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- RFQ for Biosolids Digester Facilities - Southeast Treatment ...
- Request/Notice for Qualifications for Biosolids Digester Fac...
- REJECTED: Bay Corridor Transmission and Distribution - Phase...
- Mission Street, 16th to Cesar Chavez, Brick Sewer Rehabilita...
- Green Infrastructure (Bio Retention) on The Van Ness Improve...
- 8-Inch DIP and 12-Inch ERDIP Water Main Installation on 22nd...
