Adams Park Annual Green Infrastructure Maintenance
Sector: Road • Location: Nebraska, United States of America
Source: Nebraska Purchasing Group
The work covered by this specification consists of routine structural and vegetation maintenance for the City of Omaha ’ s ( City ) Adams Park Green Infrastructure Facility ( Adams Park GI ). It was constructed as part of the City of Omaha ’ s ( City ) OPW 52390A - Adams Park Landscape Improvements in 2016 . As
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Hydro
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about Adams Park Annual Green Infrastructure Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work covered by this specification consists of routine structural and vegetation maintenance for the City of Omaha ’ s ( City ) Adams Park Green Infrastructure Facility ( Adams Park GI ). It was constructed as part of the City of Omaha ’ s ( City ) OPW 52390A - Adams Park Landscape Improvements in 2016 . As designed , Adams Park will act as a combination large wetland and stormwater detention basin . During dry weather , a permanent pool will be present up to an elevation of approximately 1074 - ft to 1075 - ft . During rain events , stormwater runoff will enter the Adams Park GI at the outfall structure located at the south end of the park near 36th and Maple Street . After the event , dewatering of the pool occurs through the Basin Discharge Control Structure ( BDCS ), located at the north end of the park . For very large precipitation events the elevation of water may reach a maximum elevation of 1082 - ft , which is the elevation of the auxiliary spillway of the dam . If this water elevation is reached , flows will overtop the dam embankment at the auxiliary spillway and flow down Bedford Ave . The site can be accessed from both the north and south ends of the park . Approximate limits of maintenance is below a rock mow strip around the site . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Hydro |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
