Request for Proposal Specifications The De Soto # 73 School District is seeking competitive bids for Pour - in - Place Playground Surfacing . Below are the Minimum Specifications : Specifications Product Specification : The type of material to be used for the project is pour - in - place surfacing with a minimum requir

Status
Closed
Sector
Road, Cement
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Adjusted Pour - in - Place Playground Surfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Adjusted Pour - in - Place Playground Surfacing” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Request for Proposal Specifications The De Soto # 73 School District is seeking competitive bids for Pour - in - Place Playground Surfacing . Below are the Minimum Specifications : Specifications Product Specification : The type of material to be used for the project is pour - in - place surfacing with a minimum requirement of the project to consist of at least 40 % Missouri generated scrap tires . The materials for the project must use at least 40 % Missouri generated scrap tires to be eligible . All bids must specify the minimum percentage of Missouri generated scrap tires used in their product documented by dated copies on company letterhead along with the bid documents . Project Description : The intention of the district is to have the vendor complete all site prep and required underlayment once the district has removed all wood chips from the identified locations . The underlayment should be an approved material other than concrete to reduce costs unless concrete is less expensive than the alternative being presented by the vendor . The district would like to add the pour - in - place surfacing to three ( 3 ) specific areas on the Athena Elementary playground located at 3775 Athena School Road in De Soto , Missouri . The surfacing material color should be color matched as close as possible with the current pour - in - place surfacing at the existing Athena Elementary School playground . The district knows it may be cost prohibitive to complete all areas and thus reserves the right to select one area , two areas , or all three areas from a single vendor depending on the cost . Area A is approximately 2 , 567 Sq . Feet , Area B is approximately 1 , 721 Sq . Feet , and Area C is approximately 1 , 767 Sq . Feet . The total Square footage is 6 , 055 for the total project . Cost Breakdown Format : A cost breakdown is required for each option A , B , and C shown in the image below , broken down by the following categories : Area A 1 . Site prep and underlayment cost $ ______ and material _______________ to be used 2 . Pour - in - play ( scrap tire material ) cost $ _____ and percentage______ % of Missouri generated scrap tires used in the product 3 . Delivery cost $ _____ 4 . Installation by Vendor cost $ _____ 5 . Total cost $ _____ Area B 6 . Site prep and underlayment cost $ ______ and material _______________ to be used 7 . Pour - in - play ( scrap tire material ) cost $ _____ and percentage______ % of Missouri generated scrap tires used in the product 8 . Delivery cost $ _____ 9 . Installation by Vendor cost $ _____ 10 . Total cost $ _____ Area C 11 . Site prep and underlayment cost $ ______ and material _______________ to be used 12 . Pour - in - play ( scrap tire material ) cost $ _____ and percentage______ % of Missouri generated scrap tires used in the product 13 . Delivery cost $ _____ 14 . Installation by Vendor cost $ _____ 15 . Total cost $ _____ The image above provides a diagram of the specific areas to be addressed in the project . Area A is approximately 2 , 567 Sq . Feet , Area B is approximately 1 , 721 Sq . Feet , and Area C is approximately 1 , 767 Sq . Feet . The total Square footage is 6 , 055 for the total project . The De Soto School District reserves the rights to reject and approve individual options without a cost variance on an individual option .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender