Admin Building HVAC Upgrade 2nd and 3rd floors
Sector: Education • Location: Mississippi, United States of America
Source: Mississippi Purchasing Group
HVAC Upgrades provide and install mini split units for classrooms , offices , and hallways on 2nd and 3rd floors of the admin building located at 201 W . Main Blue Mountain , MS . • Install f variable refrigerant flow ( VRF ) heat recovery systems . • All indoor fan coil units will be cassette type ceiling - mo
- Status
- Closed
- Sector
- Education, Commercial, Cement
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about Admin Building HVAC Upgrade 2nd and 3rd floors
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | HVAC Upgrades provide and install mini split units for classrooms , offices , and hallways on 2nd and 3rd floors of the admin building located at 201 W . Main Blue Mountain , MS . • Install f variable refrigerant flow ( VRF ) heat recovery systems . • All indoor fan coil units will be cassette type ceiling - mounted . • Each room will have ceiling cassette for cooling comfort and individual room control . • Provide and install all necessary electrical connections for indoor fan coil units ( 208V , single - phase , 60Hz ) and outdoor condensing units ( 208V , three - phase , 60Hz ). • Provide and install condensate drainage for each indoor fan coil unit . • Provide and install an acoustical drop ceiling in the hallways . Ceiling will consist of 2 ' x 2 ' tiles with a 15 / 16 " grid system and conceal all wiring and connections . Additional Work : • Provide and install new condensate piping from each unit run to nearest drain • Provide and install new Electrical distribution for each new mini split unit • Panel to be mounted on roof and run to each unit • Provide Roof cut and patch for new penetrations required for refrigerant line sets and electrical • Provide Professional Mechanical Engineering services including design drawings • Provide Professional Electrical Engineering services including design drawings • Provide Structural Engineering services if required • Provide necessary labor , miscellaneous material , permits , lifts , and startup to complete installation • All work to be performed during normal business hours , Monday through Friday • Provide concrete pads for all outdoor condensing units . • All classrooms will have independent , wired thermostats for individual temperature control . • Integrated remote control system for heating / cooling efficiency and cost control • Quotes to include all start - ups and testing • Provide a parts labor warranty on the entire system . |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Education, Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Education tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- 23MISC11 Sign Language Interpreting Agency Services
- 21MISC11 Adaptive Equipment for Rock Creek School
- 23MISC15 Request for Qualifications of Photography Vendors
- 23CURR1 Music Equipment Supplies
- Bid 20C17 Waverley Elementary School New School Construction ReBid Contract Package 9D ResilientRubber Athletic Surfacing
- Living Shoreline Exhibit
- Communitywide Vulnerability Assessment Community and Stakeholder Engagement Workshops
