Agate Blowdown Line
Closed · Nebraska · Last reported Feb 2026
Source: Nebraska Purchasing Group
The project is located in Lincoln , Nebraska and is being constructed to convey chlorinated process blowdown water from the Agate site for Vandelay Industries approximately three miles to a metering and dosing vault . The blowdown water will be dechlorinated and discharged into Salt Creek outside the treatmen
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Chemical (Industrial), Rail, Steel, Manufacturing (Industrial), Commercial, Cement
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about Agate Blowdown Line
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project is located in Lincoln , Nebraska and is being constructed to convey chlorinated process blowdown water from the Agate site for Vandelay Industries approximately three miles to a metering and dosing vault . The blowdown water will be dechlorinated and discharged into Salt Creek outside the treatment train at the Northeast Water Resource Recovery Facility . A bulleted list of items to be performed include : • Installation of approximately 14 , 2120 linear feet of 18 ” PVC pressure pipe installed using open - cut installation methods . • Three trenchless road crossing including interstate I - 80 and two City streets , that total approximately 735 linear feet of 36 ” steel casing pipe with 18 ” PVC pressure carrier pipe installed using trenchless methods . • One trenchless crossing of Salt Creek using horizontal directional drilling methods , that includes approximately 728 linear feet of 20 ” HDPE . • Construction of a precast concrete outfall at the Northeast Water Resource Recovery Facility for discharge of the process blowdown water . • Construction of a below ground cast - in - place concrete metering and dosing vault at the Northeast Water Resource Recovery Facility . • Installation of a fiberglass prefabricated building over the concrete vault for chemical feed and chemical storage . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Chemical (Industrial), Rail, Steel, Manufacturing (Industrial), Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
