logo

Air Curtain Ash Rake

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

2026 or 2027 new air curtain ash rake compatible for the Air Burners S327 Air Curtain. CONSTRUCTION: Material - High carbon steel rake head with reinforced welds; Handle -Heavy gauge steel tubular handle; Heat Rating - Suitable for continuous exposure to 1,600?2,000?F chamber temperatures; Finish - Industrial high temp black oxide or heat resistant coating. DIMENSIONS: Overall Length: 72?96 inches

Status
Closed
Sector
Aerospace & Defense, Steel, Commercial, Residential, Manufacturing (Industrial)
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Air Curtain Ash Rake

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Air Curtain Ash Rake” is a tender record in Taiyo, linked to the Aerospace & Defense sector. It is issued for works, goods, or services related to Ft Hood TX.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

2026 or 2027 new air curtain ash rake compatible for the Air Burners S327 Air Curtain. CONSTRUCTION: Material - High carbon steel rake head with reinforced welds; Handle -Heavy gauge steel tubular handle; Heat Rating - Suitable for continuous exposure to 1,600?2,000?F chamber temperatures; Finish - Industrial high temp black oxide or heat resistant coating. DIMENSIONS: Overall Length: 72?96 inches (6?8ft), Rake Head Width: 12?16 inches, Rake Head Thickness: 1/4in ? 3/8in plate steel, Handle Diameter: 1?1.25in WEIGHT: Approx. 12?18lbs, depending on length and head configuration. FUNCTIONAL USE - PRIMARY FUNCTIONS: Ash leveling during active burns, pulling unburned material toward the combustion zone, clearing burn chamber floor after shutdown, managing hot coals to maintain optimal burn efficiency, assisting with chamber clean out before next operational cycle. OPERATIONAL COMPATIBILITY -DESIGNED FOR USE WITH: Fire Box S Series (S111, S220, S327, S330, S460, etc.), Fire Box skid mounted and trailer mounted units, Air Curtain Destructor (ACD) military variants. SAFETY and COMPLIANCE - SAFETY FEATURES: Extended handle length for operator standoff distance, heat resistant construction to prevent tool failure, reinforced rake head to withstand heavy debris loads. Option - The optional ash clean-out implement with a blank 1in steel faceplate, for welding on a future connection supplied by the buyer. Final price shall include shipping to Ft Hood TX 76544.

Original sector

Not Identified

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Aerospace & Defense, Steel, Commercial, Residential, Manufacturing (Industrial)

Article published date

2026-05-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender