Air Source Heat Pumps (ASHPs)
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
AGH Solutions Ltd requires the urgent replacement of compressors within the Air Source Heat Pumps (ASHPs) serving the modular Intensive Care Unit (ICU) facility. The ASHPs provide critical heating and environmental support to accommodation occupied by critically ill patients. The modular ICU facility and its Air Source Heat Pumps (ASHPs) were commissioned approximately five years ago and should no
- Status
- Closed
- Sector
- Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Air Source Heat Pumps (ASHPs)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | AGH Solutions Ltd requires the urgent replacement of compressors within the Air Source Heat Pumps (ASHPs) serving the modular Intensive Care Unit (ICU) facility. The ASHPs provide critical heating and environmental support to accommodation occupied by critically ill patients. The modular ICU facility and its Air Source Heat Pumps (ASHPs) were commissioned approximately five years ago and should not yet have reached the end of their expected operational life. However, a specialist engineering assessment has confirmed significant compressor failures requiring replacement to maintain system resilience and functionality. The premature failure of these components is currently being investigated with the original building constructor and associated parties to establish the underlying cause and determine any contractual or warranty implications. Notwithstanding these ongoing discussions, the Trust must take immediate action to ensure continuity of critical care services and cannot delay replacement whilst liability and remedial responsibilities are being determined. Replacement compressors are subject to an estimated lead time of 8-10 weeks. Any delay in placing an order would materially increase the risk of component failure during the winter period, potentially affecting the environmental resilience of accommodation used to support critically ill patients. Total amount: £133,759.00 excluding VAT |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Commercial |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United Kingdom
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- NCH - Mental Health Unit Furniture Tender
- ID 6246207 - SEUPB - Information Services - Data Protection Officer Advisory Services
- Aquisição de Serviços para ações de promoção e divulgação das DOP Porto e Douro no mercado do Reino Unido
- SUMIT Project - Provision of Digital Products
