Air Traffic Control Tower Communications and Weather Station Package
Sector: Airport • Location: Georgia, United States
This project consists of supplying, installation, test and commission of the new Atlanta Regional Airport Falcon Field Airport ¿ Air Traffic Control Tower (ATCT) Communications and Weather Equipment. Deliver a fully operational communications and weather system that is in compliance with the Federal Contract Tower FAA Minimum Equipment List. Contractor shall provide all labor, tools, materials and
- Status
- Closed
- Sector
- Airport, Advanced Electronics, Energy Storage, Wind, Manufacturing (Industrial), Metal, Power Transmission, Telecommunications, Broadband, Aerospace & Defense, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Air Traffic Control Tower Communications and Weather Station Package
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project consists of supplying, installation, test and commission of the new Atlanta Regional Airport Falcon Field Airport ¿ Air Traffic Control Tower (ATCT) Communications and Weather Equipment. Deliver a fully operational communications and weather system that is in compliance with the Federal Contract Tower FAA Minimum Equipment List. Contractor shall provide all labor, tools, materials and equipment and perform all work required for the installation, wiring, connecting, adjusting, testing, commissioning and training and warranting of all items. A new Airfield Lighting Control Panel and Secondary Weather Wind Sensor tower is included in this scope. The Contractor¿s installers shall provide evidence of prior experience on at least three (3) locations within the last five (5) years where as they have demonstrated the ability to install, configure and integrate all equipment needed to meet FAA minimum equipment standards as laid out in FAA Advisory Circular 90-93A and the FAA Contract Tower Minimum Equipment List. Contractor shall provide copies of FCC radiotelephone license for radio certification. Airport has the right, for any reason, to refuse unqualified Contractors regardless of bid price. |
Original sector | Information Technology |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Airport, Advanced Electronics, Energy Storage, Wind, Manufacturing (Industrial), Metal, Power Transmission, Telecommunications, Broadband, Aerospace & Defense, Power Generation (CCGT) |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States
- Pre-Advertisement Notice for Digital Revenue Intelligence and Engagement (DRIVE)
- RFQ 2026-0038 2027 Landside Facilities, Airfield & Engineering Safety Eyewear
- AIRPORT CONSULTING SERVICES RFQ 2026 - ENGINEERING
- RFP 2026-0019 Mulch Installation Services
- RFP 2026-0023 Annual Contract for Fence Removal and Installation
- SAC 30651 Taxilane GA-5 Reconstruction and Widening
- ITB 26-19 Vending Machine Services Annual Contract for Clayton County, Georgia
- RFP 2026-0025 Holdroom Interior Design, Furnishing, and Installation Services
