Ala Wai Small Boat Harbor Slips 613 - 622 Pier Repairs
Closed · Hawaii · Last reported Apr 2026
Source: Hawaii Purchasing Group
The project is located at Ala Wai Small Boat Harbor , Honolulu , Oahu , Hawaii . The purpose of this Invitation for Bids ( IFB ) is to award to a Contractor work that shall generally consist of obtaining all required project permits including U . S . Army Corps of Engineers permit , demolition work , new concret
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Seaport, Cement, Power Transmission
- Location
- Hawaii, United States of America
- Updated
- 3 Nov 2026
- Source
- Hawaii Purchasing Group
ConstructChat
Ask ConstructChat about Ala Wai Small Boat Harbor Slips 613 - 622 Pier Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project is located at Ala Wai Small Boat Harbor , Honolulu , Oahu , Hawaii . The purpose of this Invitation for Bids ( IFB ) is to award to a Contractor work that shall generally consist of obtaining all required project permits including U . S . Army Corps of Engineers permit , demolition work , new concrete abutments , new gates , construction of five ( 5 ) new piers , and appurtenant work as show in the plans , specifications , and bidding documents issued with this solicitation . 1 . 1 GENERAL REQUIREMENTS Work shall consist of furnishing all labor , tools , materials and equipment necessary and required to construct in place complete all work as indicated on the drawings and as specified herein . 1 . 2 GENERAL A . Construction Lines , Levels and Grades : The Contractor shall verify all lines , levels and elevations indicated on the drawings before any clearing , excavation or construction begins . Any discrepancy shall be immediately brought to the attention of the Engineer , and any change shall be made in accordance with the Engineer ' s instruction . The Contractor shall not be entitled to extra payment for failing to report the discrepancies before proceeding with any work whether within the area affected or not . B . Examination of Premises : The Contractor shall contact the Engineer and obtain permission before visiting the site . C . Notices : The Contractor shall notify the Engineer and give at least three ( 3 ) working days notice before starting any work . D . Disruption of Utility Services : All work related to the temporary disconnection of electrical system shall be pre - arranged with the Engineer so that any disruption of such services will be kept to a minimum . In the event temporary power hookup is required , the Contractor shall provide the necessary services . E . Contractor ' s Operations 1 . The Contractor must employ , insofar as possible , such methods and means of carrying out the work so as not to cause any interruption or interference to the facility ' s operations . Where the Contractor ' s operations would result in interruptions which would hamper the operations of the facilities , the Contractor shall rearrange the schedule of work accordingly . 2 . The Contractor shall maintain safe passageway to and from the facility ' s occupied rooms and other occupied spaces for the user agency personnel and the public at all times . F . Contractor Use of Premises 1 . The Contractor shall review the applicable asbestos survey reports and insure that he fully understands their contents as to whether and where there may be asbestos containing materials ( ACM ) in the building ( s ) in which he will be working . 2 . The Contractor shall inform its employees , subcontractors and all other persons engaged in the project of the presence ( as applicable ) of asbestos in the existing buildings at the job site in accordance with the requirements of Chapter 110 , Article 12 - 110 - 2 ( f ) ( 1 ) ( B ) of the Occupational Safety and Health Standards , State of Hawaii . 3 . In the event the Contractor , its subcontractor ( s ) and / or other persons engaged in the project must work in any building ( s ) on the site other than that one ( s ) designated in the project , the Contractor shall request copies of the asbestos survey report ( s ) for the building ( s ) from the Engineer and notify all persons as indicated in Item 2 above . |
Location
Country | United States of America (USA) |
State | Hawaii |
Source
Source | Hawaii Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Commercial, Seaport, Cement, Power Transmission |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
