logo

Allerton TCC 331 Heavy Maintenance Feasibility

Planning · United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Planning

We propose to evaluate the possible infrastructure solutions at Allerton TCC for feasibility and option selection assessments as per the outline scope below:

  • To evaluate and define optimal solutions for bogie drop, transfer, and storage facilities, as well as jacking systems and a potential shed extension, to support heavy maintenance operations for 3-car and 4-car Class 331 units, with future-p
Status
Prospective
Sector
Road, Automotive
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Allerton TCC 331 Heavy Maintenance Feasibility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Allerton TCC 331 Heavy Maintenance Feasibility” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

We propose to evaluate the possible infrastructure solutions at Allerton TCC for feasibility and option selection assessments as per the outline scope below: - To evaluate and define optimal solutions for bogie drop, transfer, and storage facilities, as well as jacking systems and a potential shed extension, to support heavy maintenance operations for 3-car and 4-car Class 331 units, with future-proofing considerations. - 3 car HM cycle is due March 2028 and the 4 car units will commence Jan 2029 this report will determine if there is potential for a phased approach to enable 3 car maintenance to be undertaken with 4 car requirements being constructed at a later stage, and if it should be foreseeable that its possible undertake 3 car maintenance cycle, whilst being able to complete the required construction works for 4 car unit facilities. - The additional requirements for 4 car units to be maintained would be additional jacking equipment, shed extension to road 4 / 5 shed, foundations/pits and storage for the additional 4-wheel sets (2 old & 2 new) This feasibility and option selection project will identify the optimum solution to each issue. The solution must be deliverable, operationally efficient, represent value for money and meet NTL strategic objectives. The Selected option for each proposed scheme will form the work scope for the design phase. Completing this feasibility and option selection will allow the proposed schemes to commence at design stage, improving project delivery efficiency.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Road, Automotive

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender