Alpha Ventus Decommissioning - BoP scope
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
The contract shall include all the required work for the decommissioning of Balance of Plant (BoP) components for the Alpha Ventus Offshore Wind Farm.
The scope of work for the BoP decommissioning shall comprise: • Dismantling and transport to shore of all 12 WTG foundations (6 Jackets and 6 Tripods) as well as the OSS Jacket installed within Alpha Ventus OWF, including provision of required vess
- Status
- Closed
- Sector
- Wind, Raw Materials, Oil and Gas, Warehouse, Seaport, Power Generation (CCGT)
- Location
- Germany
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Alpha Ventus Decommissioning - BoP scope
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contract shall include all the required work for the decommissioning of Balance of Plant (BoP) components for the Alpha Ventus Offshore Wind Farm. The scope of work for the BoP decommissioning shall comprise: • Dismantling and transport to shore of all 12 WTG foundations (6 Jackets and 6 Tripods) as well as the OSS Jacket installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. o Option 1: Partial pile removal (mechanical separation of piles and supporting structure). o Option 2: Full pile extraction (additional scope of complete pile removal by Vibrohammer or other extraction method). • Dismantling and transport to shore of the OSS Topside installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. • Cutting and recovery of inter-array cables and related cable protection systems installed within Alpha Ventus OWF and transport to shore, including provision of required vessels, equipment, tools and personnel. • Optional: Cutting the export cable at the offshore substation including wet storage. • Optional: Removal and transport to shore of Scour Protection installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. • Provision of required marshalling harbours and other support services. • Onshore processing and disposal/recycling of all components, including temporary storage, logistics and facilities. • All required engineering works and creation of planning documentation. • Pre/post decommissioning surveys (as required) The works are expected to commence from 2027 onwards, however we are also considering start dates in 2028. |
Original sector | Services related to the oil and gas industry, Other community, social and personal services, Transport services (excl. Waste transport), Transport services (excl. Waste transport), Transport services (excl. Waste transport), Construction work |
Location
Country | Germany |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Raw Materials, Oil and Gas, Warehouse, Seaport, Power Generation (CCGT) |
Article published date | 2025-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in Germany
- Top Wind Tunnels
- Wheel Loader
- Husum, JuLeKa, Neubau Hallenschießanlage - Fachplanung Technische Ausrüstung AG 8
- Lieferung, Installation und Inbetriebnahme eines DC-Kabelmodells für ein Niederspannungsmodellnetz
- Energie-Geschäftsreiseprogramm im Rahmen der Exportinitiative Energie des BMWE 2027, 1. Tranche
- Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
- Projektierung eines Windparks
- Baukonzession für die Planung, Errichtung und den Betrieb von Windenergieanlagen am Standort der Deponie in Dörpen
