Alpha Ventus Decommissioning - WTG scope
Sector: Seaport • Location: Germany
Source: TED Europa
The contract shall include all the required work for the decommissioning of Wind Turbine Generators (WTGs) for the Alpha Ventus Offshore Wind Farm.
The scope of work for the decommissioning of 12 WTGs (6x Adwen AD 5-116 and 6x Senvion 5M; 5 MW rated power each) at Alpha Ventus shall comprise:
- Offshore dismantling of WTGs (i.e. rotor-nacelle-assemblies and towers) and offshore transport, prov
- Status
- Closed
- Sector
- Seaport, Wind, Power Generation (CCGT), Oil and Gas, Raw Materials, Waste Processing and Treatment
- Location
- Germany
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Alpha Ventus Decommissioning - WTG scope
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contract shall include all the required work for the decommissioning of Wind Turbine Generators (WTGs) for the Alpha Ventus Offshore Wind Farm. The scope of work for the decommissioning of 12 WTGs (6x Adwen AD 5-116 and 6x Senvion 5M; 5 MW rated power each) at Alpha Ventus shall comprise: - Offshore dismantling of WTGs (i.e. rotor-nacelle-assemblies and towers) and offshore transport, providing all required vessels, equipment, tools and personnel. - Load-in and onshore handling, providing all required port/harbour facilities and support services. - Onshore processing of WTG components and waste management, providing all temporary storage, transport and facilities until final disposal. In this context disposal includes re-use, recycling and recovery of energy of materials. - Provision of required marking and make safe activities for the remaining foundation structures following WTG removal. - Provision of all required planning documentation and engineering works as well as project management activities for the above decommissioning scope. The works are expected to commence from early 2027 onwards, however we are also considering start dates in 2028. |
Original sector | Services related to the oil and gas industry, Other community, social and personal services, Electrical machinery, apparatus, equipment and consumables; lighting, Construction work, Electrical machinery, apparatus, equipment and consumables; lighting, Transport services (excl. Waste transport), Services related to the oil and gas industry |
Location
Country | Germany |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Seaport, Wind, Power Generation (CCGT), Oil and Gas, Raw Materials, Waste Processing and Treatment |
Article published date | 2026-10-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Seaport tenders in Germany
- Voyage Repairs (Vr)
- Cuas Interceptor, 7Atc 10Jul26
- Scba Breathing Air Compressor Filling Station (Eu Specification) – Usag Ansbach Fire Rescue
- Kaimauersanierung G/KB/O und S/T/U
- Sicherheitsdienstleistungen Kreuzfahrtterminals
- Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4
- 536 Los 2 & 4 - Kampfmittel & Erdbau
- Lieferung von Strom für die SEEHAFEN KIEL GmbH & Co. KG in 2027 und 2028
