logo

Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, Pa

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Solicitation

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway

Status
Closed
Sector
Tunnel, Cement, Hydro, Road, Aerospace & Defense, Commercial, Residential
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, Pa

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, Pa” is a tender record in Taiyo, linked to the Tunnel sector. It is issued for works, goods, or services related to Albin Bush DamKettle Creek, Clinton County, PA.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

Original sector

Construction

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Tunnel, Cement, Hydro, Road, Aerospace & Defense, Commercial, Residential

Article published date

2026-04-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender