Ambler Access Project ( AAP ) Drilling Field Work
The scope, dates and status of this tender. A free account opens every field.
Source: Alaska Purchasing Group
The Alaska Industrial Development and Export Authority ( AIDEA ) is soliciting proposals from qualified Offerors to complete a winter and summer drilling field program . The purpose of this work is to clear helicopter landing zones and work areas , obtain essential field geotechnical and coring data for roadway ,
- Status
- Closed
- Sector
- Bridge, Manufacturing (Industrial), Warehouse
- Location
- Alaska, United States of America
- Updated
- 3 Nov 2026
- Source
- Alaska Purchasing Group
ConstructChat
Ask ConstructChat about Ambler Access Project ( AAP ) Drilling Field Work
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Alaska Industrial Development and Export Authority ( AIDEA ) is soliciting proposals from qualified Offerors to complete a winter and summer drilling field program . The purpose of this work is to clear helicopter landing zones and work areas , obtain essential field geotechnical and coring data for roadway , embankment , drainage , and bridge foundation design for the proposed Ambler Access Project . Activities under this scope are investigative in nature and do not include construction of permanent improvements . The winter work period is defined as having at least six inches of snow cover on the ground and the summer work period is defined as the time when the snow is less than that amount . The Offeror awarded shall deliver core samples to AIDEA ’ s designated third - party Geotechnical Laboratories in a condition and of a quality sufficient for the Laboratory to prepare a Geotechnical Report that will be used by structural engineers to complete final bridge designs for the project . Work will occur on lands managed by the Bureau of Land Management ( BLM ), State of Alaska , National Park Service ( NPS ) within the Gates of the Arctic National Preserve , Northwest Arctic Borough ( NAB ), and private landowners ( Nana Regional Corporation and Doyon , Limited ) where permissions are granted . Permits shall be provided to Offerors as necessary . AIDEA defines the required outcomes and deliverables . Offerors are expected to determine and describe in their proposals the means , methods , logistics , sequencing , and resources required to achieve these outcomes safely and in compliance with all applicable permits and regulations . Relevant data and documentation regarding routes , locations , and permits can be found at the address below , and Offerors are encouraged to check this frequently to ensure they have all the information that may be released through an addendum . https :// www . aidea . org / AAP_DrillingFieldWork_RFP |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Alaska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Manufacturing (Industrial), Warehouse |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
