Amendment 1 To 7 Ultrasonic Flowmeters
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
Amendment 1to RFQ 1333ND26QNB610465 Clarification questions: Vendor Question 1: Could you please confirm the solids content (TSS) of the water? If this is clean water, with less than 2% TSS, please let us know so we can determine the appropriate unit for the application. NIST Response: This water is moderately clean, not a slurry (2% TSS is closer to wastewater) but not filtered Vendor Question 2:
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Residential, Commercial
- Location
- Gaithersburg, Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Amendment 1 To 7 Ultrasonic Flowmeters
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment 1to RFQ 1333ND26QNB610465 Clarification questions: Vendor Question 1: Could you please confirm the solids content (TSS) of the water? If this is clean water, with less than 2% TSS, please let us know so we can determine the appropriate unit for the application. NIST Response: This water is moderately clean, not a slurry (2% TSS is closer to wastewater) but not filtered Vendor Question 2: The factory has confirmed that no software is required to configure the meter, as very few ultrasonic meters require software for configuration. NIST Response: PC-based data logging is a nice-to-have but not a necessity. Vendor Question 3: (clarification on the following process conditions for the primary and secondary cooling systems) Operating temperature of the process fluid (or pipe surface temperature) at the measurement points, for both the primary and secondary cooling loops. This determines whether standard or high-temperature transducers are required. NIST Response: No higher than 114 degrees Fahrenheit. Vendor Question 4: (clarification on the following process conditions for the primary and secondary cooling systems) Operating pressure of the cooling water at the measurement points (primary and secondary). NIST Response: No higher than 10 psia. Vendor Question 5: (clarification on the following process conditions for the primary and secondary cooling systems) Confirmation of the process fluid — the SOW references cooling water; please confirm it is treated water with no significant entrained solids or aeration that could affect ultrasonic signal transmission. NIST Response: Primary – Heavy water, purified. Secondary - Water with minimal solids. Some algae to be expected but not significant. As defined in the attached Combined Synopsis Solicitation, Statement of Work and RFO Provisions and Clauses. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Maryland |
City | Gaithersburg |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2026-08-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
