Amendment 2 to Solicitation for Ultra - High Vacuum Sample Backout Chamber Extension of Time
Sector: Water Supply and Storage • Location: Rocky Mountain E-Purchasing System, United States of America
Source: Rocky Mountain E-Purchasing System
AMENDMENT 2 : Extension of time 1 week from February 25 , 2026 to new date for responses March 4 , 2026 . AMENDMENT TO SOLICITATION FOR VENDOR QUESTIONSSolicitation 1333ND26QNB030068 Ultra High Vacuum Sample Backout ChamberVendor Question 1 : To accurately provide a quote for the chamber and frame , I would need a
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport
- Location
- Rocky Mountain E-Purchasing System, United States of America
- Updated
- 3 Nov 2026
- Source
- Rocky Mountain E-Purchasing System
ConstructChat
Ask ConstructChat about Amendment 2 to Solicitation for Ultra - High Vacuum Sample Backout Chamber Extension of Time
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | AMENDMENT 2 : Extension of time 1 week from February 25 , 2026 to new date for responses March 4 , 2026 . AMENDMENT TO SOLICITATION FOR VENDOR QUESTIONSSolicitation 1333ND26QNB030068 Ultra High Vacuum Sample Backout ChamberVendor Question 1 : To accurately provide a quote for the chamber and frame , I would need a drawing , STEP file , and / or sketch , as a written description alone is not sufficient for an accurate quote . NIST Response : There are many ways to design and assemble a system with the capabilities that we are requesting . We have not provided a technical drawing to allow the vendor the flexibility to design a system to meet our specifications as they see fit . We will evaluate on conformance to specifications , not a particular design . Vendor Question 2 : Regarding Technical Specification b . “ Partial pressure for masses > 44 AMU : < 5e - 11 Torr ”: How is this intended to be controlled / measured with a base pressure of 1e - 8 Torr . NIST Response : We will verify the stated specification with an RGA unit in our lab . Ultimately , this specification is to ensure that the UHV system is not contaminated with higher amu contaminants . The overall pressure is allowed to be 1e - 8 Torr due to lower amu components ( e . g . water ) that we can more readily get rid of with a bake - out . We are not equipped to do the requisite UHV cleaning for higher mass contaminants ( silicones , oils , etc .) so this requirement ensures the vendor provides us with a UHV - clean system . Vendor Question 3 : Will a cylindrical chamber work rather than a cube or a sphere , so long as the volume requirements are met and there are enough ports ? NIST Response : A cylindrical chamber with the same 12 ” opening dimensions would also suffice . Vendor Question 4 : What is the geometry of the sample types to be going into the chamber ? Is it like a wafer ? NIST Response : We will be using this chamber on a variety of sample sizes and shapes . As defined in the attached Combined Synopsis Solicitation , Statement of Work and applicable Clauses and Provisions . |
Location
Country | United States of America (USA) |
State | Rocky Mountain E-Purchasing System |
Source
Source | Rocky Mountain E-Purchasing System |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Seaport |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
