logo

Analysis of Protozoa in Groundwater

Bids closed Mar 2026 · Minnesota · Last reported Mar 2026

Source: Minnesota Purchasing Group

Tender
Closed

The Minnesota Department of Health ( MDH ) requests proposals from environmental laboratories for the analysis of Minnesota public water supply groundwater sources to implement analyses of Cryptosporidium and Giardia . MDH is responsible under 40 CFR 142 . 16 ( b )( 2 )( i )( B ) for identifying public water supply groundw

Status
Closed
Sector
Water Supply and Storage, Commercial, Seaport
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about Analysis of Protozoa in Groundwater

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Analysis of Protozoa in Groundwater” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Minnesota Department of Health ( MDH ) requests proposals from environmental laboratories for the analysis of Minnesota public water supply groundwater sources to implement analyses of Cryptosporidium and Giardia . MDH is responsible under 40 CFR 142 . 16 ( b )( 2 )( i )( B ) for identifying public water supply groundwater sources that are under the direct influence of surface water ( GWUDI ). These sources need to be identified to protect the public from microbial contaminants including Cryptosporidium and Giardia . Sample Tasks and Deliverables . Microbial Filters , Sample Receiving , and Return of Sample Shipping Containers . The Contractor will provide all new pre ‐ certified Elisio 25H ultrafilters with proper preservatives , labels , corresponding chain of custody forms and packing material for each sample requested . Each individual filter will be labeled with a lot and serial number for tracking purposes . The delivery of filters and associated materials will be coordinated in advance with the Minnesota Department of Health ( MDH ) sampling personnel . The State anticipates an average of 20 – 40 samples will be submitted quarterly during the period and up to 40 samples for investigative or follow - up purposes through March 2027 . The Contractor will coordinate with the State ’ s sampling personnel to ship filters and associated materials via a commercial courier . All costs associated with shipping of filters and associated material will be the responsibility of the Contractor . The Contractor will also be responsible for next day shipping costs related to submitting filters and associated materials to the laboratory , as well as shipping costs associated with the return of the shipping containers . Contractor will initiate the sample login process once the sample filters arrive at the contract laboratory . This includes verifying the sample filter integrity and the accompanying chain of custody documentation as well as recording the temperature . Samples that are not collected the same day they are received and that are received at greater than 20 degrees Celsius or frozen must be rejected . Any discrepancy encountered will be communicated to the designated State Project Manager as soon as possible . Upon receipt , the Contractor will sign the Chain of Custody ( COC ) document , taking custody of the sample filters and store them in an appropriate secured location . Samples will then be entered into the Contractor ’ s Laboratory Information Management System ( LIMS ), where a unique identification number is assigned to each sample filter . After the samples are logged into the LIMS , a sample receipt acknowledgement will be generated and sent via email to the State Project Manager for review . Microbial Analysis and Methods The Contractor will perform microbial analysis based on EPA method 1623 with modifications for tangential flow hollow - fiber ultrafiltration and heat dissociation steps as per Rhodes et al ., 2012 ( A Modified EPA Method 1623 that Uses Tangential Flow Hollow - fiber Ultrafiltration and Heat Dissociation Steps to Detect Waterborne Cryptosporidium and Giardia spp - PMC ). Analysis will consist of two target analytes : Cryptosporidium and Giardia . Any deviations from the methods , that are necessary based on lab capabilities , must be pre - approved by the State ’ s Authorized Representative or State ’ s Project Manager in advance . All sample analyses will be performed at the contract laboratory by Analysts or Principal Analysts as defined in Method 1623 and all appropriate Quality Assurance and Quality Control ( QAand QC ) practices will be followed . After analysis , the Contractor will perform a secondary review of the QC requirements and acceptance criteria outlined in Tables 3 and 4 of Method 1623 ( https :// www . epa . gov / sites / default / files / 2015 - 07 / documents / epa - 1623 . pdf ). If a discrepancy is noted , the package will be returned to the Contractor ’ s primary analyst for corrective action . Once the analytical batch is reviewed and evaluated , the Contractor ’ s Project Manager will perform a final review of the results and release the data for reporting . The analytical report consists of the final results , any relevant quality control data , and a copy of the chain of custody document . Holding Time . The Contractor will perform analysis of all microbial samples as soon as possible but sample filters may be stored between 1 degree Celsius and 10 degrees Celsius for up to 96 hours from collection prior to elution . All hold times outlined in Section 8 . 2 and Table 1 of Method 1623 ( https :// www . epa . gov / sites / default / files / 2015 - 07 / documents / epa - 1623 . pdf ) must be met . All sample analysis completed after the holding times specified above must be approved by the State ’ s Authorized Representative or the State ’ s Project Manager in advance . Reporting Requirements and Electronic Data Submittal .

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Commercial, Seaport

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender