logo

Annual Chiller Preventative Maintenance

The scope, dates and status of this tender. A free account opens every field.

Source: Kentucky Purchasing Group

Tender
Closed

Air - Cooled Chillers : • Clean all condenser coils with acidic base cleaner . ( exception for manufacturers requirements ) • Take oil samples and send off to ensure all is clean and operable . ( required to give sample results upon receipt ) • Scroll / Screw compressors oil change and filters determined after results f

Status
Closed
Sector
Oil and Gas, Education, Water Supply and Storage
Location
Kentucky, United States of America
Updated
3 Nov 2026
Source
Kentucky Purchasing Group

ConstructChat

Ask ConstructChat about Annual Chiller Preventative Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Annual Chiller Preventative Maintenance” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Kentucky, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Air - Cooled Chillers : • Clean all condenser coils with acidic base cleaner . ( exception for manufacturers requirements ) • Take oil samples and send off to ensure all is clean and operable . ( required to give sample results upon receipt ) • Scroll / Screw compressors oil change and filters determined after results from samples . • Tighten all electrical Connections and ensure no corrosion is found around terminals , from the starter to the chiller . • Read and log all voltages on compressors and fan motors . • Read and log all amperages on compressors and fan motors . • Read and log all refrigerant pressures on each compressor for all circuits . • Read and log all temperature drops across the chilled water barrels . • Clean inlet water strainers on chiller . ( if chiller has them ) Water - Cooled Chillers : • Remove all chiller barrel end caps . • Rod out every individual tube in each chiller barrel . • Provide and install new gaskets to put the barrel end caps back on . • Take oil samples and send off to ensure all is clean and operable when applicable . ( required to give sample results upon receipt ) • Check oil pump for proper operation .

Location

Country

United States of America (USA)

State

Kentucky

Source

Source

Kentucky Purchasing Group

URL

More Details

Record type

Tender

Sector

Oil and Gas, Education, Water Supply and Storage

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender