Annual Labor - Sewer Lines
One of 10,000+ tenders Taiyo tracks in Georgia.
Henry County Water Authority¿s annual labor contract work includes sewer line extensions and/or sewer line relocations. Portions of the projects will include installation of new sewer lines along rural area roadways, new extensions along stream corridors, the relocation of existing lines in more urbanized areas due to road improvement projects, and/or rehabilitation of lines in older subdivisions.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Annual Labor - Sewer Lines
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Henry County Water Authority¿s annual labor contract work includes sewer line extensions and/or sewer line relocations. Portions of the projects will include installation of new sewer lines along rural area roadways, new extensions along stream corridors, the relocation of existing lines in more urbanized areas due to road improvement projects, and/or rehabilitation of lines in older subdivisions. This information should be considered when preparing bids. Since developers/residents pay for most line extensions, The Authority has no list available for proposed extensions that may evolve throughout the year. Sewer line relocation projects will generally follow proposed road improvement projects planned throughout the year 2026 by the Henry County SPLOST Department, the Henry County Department of Transportation, and/or the Georgia Department of Transportation. A list of the proposed projects may be obtained from each of those offices. Scheduling of road projects is subject to change with very little advanced notice. Therefore, it is important for contractors to have adequate equipment and personnel available to perform multiple projects simultaneously. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States
- Concrete Pavement Services
- Place HMA overlay and replace AC surfacing.
- SB Minor B 03A4145 / Pedestrian Safety Improvement In Colusa, Sacramento, Sierra, Yolo, and Yuba Counties at Various Locations
- Lucky Street Water and Sewer Replacement
- Grantland Water Main Extension Between Shaw & Gettysburg
- Wilson Park Senior Adult Services Accessibility Improvements Project
- SB Minor B 05A3048 - Relocate Controller Assembly in Santa Cruz County
- SB Minor B 03A4143 - Install a Rectangular Rapid-Flashing Beacon in Placer County
