AO10 Environmental Impact Assessment
One of 10,000+ tenders Taiyo tracks in France.
Source: TED Europa
Drafting, Support, and Compilation of Documents Required for the Submission of a Unique Authorization Application – Projects in Exclusive Economic Zones (EEZ) or Public Maritime Domain (DPM) This involves the preparation of environmental impact study files, Natura 2000 impact assessments, and requests for derogation concerning protected species, as well as support during the examination and consul
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Government, Seaport, Raw Materials
- Location
- France
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about AO10 Environmental Impact Assessment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Drafting, Support, and Compilation of Documents Required for the Submission of a Unique Authorization Application – Projects in Exclusive Economic Zones (EEZ) or Public Maritime Domain (DPM) This involves the preparation of environmental impact study files, Natura 2000 impact assessments, and requests for derogation concerning protected species, as well as support during the examination and consultation phases, all the way to the issuance of authorization for an offshore wind project. The specifications will concern 11 zones distributed across three French maritime façades: Façade 1: English Channel-North Sea Façade 2: South Atlantic + North Atlantic-Channel West Façade 3: Mediterranean It will include allocation rules limiting the number of projects that can be awarded to a single Producer. Candidates will be evaluated by façade and must indicate the façade(s) on which they wish to apply. Candidates will need to demonstrate their ability to address the identified themes and expertise necessary for the successful completion of the unique authorization request. This ability can be justified independently or within a consortium. If expert consultancy support is required for certain themes, that need should be specified. Note: EDF Power Solutions is still awaiting the final specifications from the State, and the contract may be subject to minor revisions as a consequence. |
Original sector | Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services |
Location
Country | France |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Power Generation (CCGT), Government, Seaport, Raw Materials |
Article published date | 2026-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in France
- Collège Guillaume-Vento Gymnase - nouveau sol sportif (06)
- Design and manufacturing of an electrical motor, for ONERA center in Lille (France)
- Design and manufacturing of an electrical motor, for ONERA center in Lille (France)
- Design and manufacturing of an electrical motor, for ONERA center in Lille (France)
- Etudes - Détection des défauts des aubes de Turbine Haute Pression (TuHP) du moteur Rafale par thermographie infrarouge au profit de l’Atelier Industriel de l’Aéronautique de Bordeaux.
- AFD-Elaboration d’un Plan d'action d'acquisition foncière et de réinstallation (LARAP) et d’un Plan d’Action Genre dans le cadre du développement d’un parc éolien dans la province de BANTEN (Indonésie//Development of Land Acquisition and Resettlement Action Plan (LARAP) and a Gender Action Plan as part of the development of a wind farm in Banten Province (Indonesia)
- AFD-Elaboration d’un Plan d'action d'acquisition foncière et de réinstallation (LARAP) et d’un Plan d’Action Genre dans le cadre du développement d’un parc éolien dans la province de BANTEN (Indonésie//Development of Land Acquisition and Resettlement Action Plan (LARAP) and a Gender Action Plan as part of the development of a wind farm in Banten Province (Indonesia)
- AFD-Elaboration d’un Plan d'action d'acquisition foncière et de réinstallation (LARAP) et d’un Plan d’Action Genre dans le cadre du développement d’un parc éolien dans la province de BANTEN (Indonésie//Development of Land Acquisition and Resettlement Action Plan (LARAP) and a Gender Action Plan as part of the development of a wind farm in Banten Province (Indonesia)
