Applegate Gravel Augmentation
Sector: Water Supply and Storage • Location: Oregon, United States of America
Source: Oregon Purchasing Group
The selected contractor will source 500 cubic yards of appropriately sized gravel ( 1 ”- 8 ”) from a local source and have it delivered to the project site ( 42 . 06866 , - 123 . 10823 ). Ideally the gravel will be at least an 80 % mix of 3 ”- 6 ” rounded river gravel , though a small portion (< 20 %) may include
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro
- Location
- Oregon, United States of America
- Updated
- 3 Nov 2026
- Source
- Oregon Purchasing Group
ConstructChat
Ask ConstructChat about Applegate Gravel Augmentation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected contractor will source 500 cubic yards of appropriately sized gravel ( 1 ”- 8 ”) from a local source and have it delivered to the project site ( 42 . 06866 , - 123 . 10823 ). Ideally the gravel will be at least an 80 % mix of 3 ”- 6 ” rounded river gravel , though a small portion (< 20 %) may include some smaller or larger based on availability . They will place 250 cubic yards in the Applegate River during the 2026 Applegate In - Water Work Period at the project site . The second placement of 250 cubic yards of gravel must occur between June 15 and June 30 of 2027 . The contractor must utilize a yarder and cable system with a carriage to move the gravel and avoid riparian impacts . The contractor will further be responsible for safely moving the gravel from its staging area , into the carriage , and placing it in - stream approximately 0 . 6 miles below the Applegate Dam . |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Oregon Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Hydro |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
