logo

Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension

One of 10,000+ tenders Taiyo tracks in Ireland.

Source: TED Europa

Tender
Contract Notice

This project comprises the comprehensive upgrade of marine electrical infrastructure at the Arklow Harbour South Quay network, involving the decommissioning of obsolete distribution equipment and the installation of a new, high-capacity electrical distribution system designed for robust, scalable performance and to allow additional outlets for fishing crew. The scope includes the potential removal

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Seaport, Telecommunications, Road
Location
Ireland
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Arklow Harbour: South Quay Pontoon Electrical Infrastructure Upgrade and Future-Proofing Extension” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to Ireland.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This project comprises the comprehensive upgrade of marine electrical infrastructure at the Arklow Harbour South Quay network, involving the decommissioning of obsolete distribution equipment and the installation of a new, high-capacity electrical distribution system designed for robust, scalable performance and to allow additional outlets for fishing crew. The scope includes the potential removal of legacy cabling and the installation of marine-grade armoured wiring, new distribution boards, and weather-resistant electrical pedestals, all engineered to support both current operational demands and future multi-berth pontoon expansions. Furthermore, the architecture is specifically configured to integrate future prepaid metering technologies, ensuring a seamless, modern, and efficient utility network that meets the harbour's long-term growth requirements. Areas include: Distribution and Control Infrastructure, Cable Management and Wiring, Earthing and Safety Systems, Lighting Infrastructure and Safety Enhancement, and Pontoon Pedestals.

Original sector

Construction work, Transport equipment and auxiliary products to transportation, Construction work, Construction work, Construction work, Construction work, Construction work, Construction work

Location

Country

Ireland

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Power Transmission, Power Generation (CCGT), Seaport, Telecommunications, Road

Article published date

2026-06-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender