Asphalt Services and Labor
One of 10,000+ tenders Taiyo tracks in Alabama.
Source: Alabama Purchasing Group
1 . Obtain materials from same source throughout each project . 2 . Abide by ADEM Requirements including all permits . 3 . Do not place asphalt when ambient air or base surface temperature is less than 40 degrees F , or surface is wet or frozen . 4 . Verification of existing conditions before starting work . 5
- Status
- Closed
- Sector
- Oil and Gas, Road
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Asphalt Services and Labor
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Obtain materials from same source throughout each project . 2 . Abide by ADEM Requirements including all permits . 3 . Do not place asphalt when ambient air or base surface temperature is less than 40 degrees F , or surface is wet or frozen . 4 . Verification of existing conditions before starting work . 5 . Verify compacted subgrade subbase is dry and ready to support paving and imposed loads . 6 . Verify gradients and elevations of base are correct . 7 . Verify gutter drainage grilles and frames and manhole frames are installed in correct position and elevation . Raise to proper elevation if necessary . 8 . Apply tack coat in accordance with ALDOT Standard Specifications for Highway Construction . 9 . Apply tack coat to contact surfaces of curbs and gutters . 10 . Coat surfaces of catch basin frames with oil to prevent bond with asphalt pavement . Do not tack coats on these surfaces . 11 . Install work in accordance with ALDOT Standard Specifications for Highway Construction . 12 . Place asphalt within 24 hours of applying primer or tack coat . 13 . Place asphalt wearing course to thickness ( 1 ½ ” minimum ). 14 . Immediately after placement , protect pavement from mechanical injury until surface temperature is less than 140 degrees F . 15 . Immediately before placing asphalt materials , remove loose and deleterious material from substrate surfaces . Ensure that prepared subgrade is ready to receive paving . 16 . Spray , kill and remove all affected vegetation to ensure complete eradication per manufacturers specifications 7 - 10 days prior to paving . Use Garlon 3A or approved equal herbicide . Mix to the max ratio recommended by the manufacturer ( generally 1 % or greater ) and must use Garlon 3A or approved equal surfactant . Do not spray carelessly or in windy conditions . Must be sprayed when a 24hr window of clear dry weather is forecasted following treatment . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Oil and Gas, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Oil and Gas tenders in United States of America
- Road Material and Hauling Services
- Used Gasoline Collection Transport Recycling Service
- Town Wide Energy Resilience Master Plan
- ANTIFREEZE OILS AND LUBRICANTS
- Road Material and Hauling Services UPDATED
- Southeast Water Pollution Control Plant Biosolids Digester F...
- Sunol Long Term Improvements Alameda Creek Watershed Center
- City Distribution Division Fueling Station - BID TABULATION
