logo

Asphalt Services and Labor

One of 10,000+ tenders Taiyo tracks in Alabama.

Source: Alabama Purchasing Group

Tender
Closed

1 . Obtain materials from same source throughout each project . 2 . Abide by ADEM Requirements including all permits . 3 . Do not place asphalt when ambient air or base surface temperature is less than 40 degrees F , or surface is wet or frozen . 4 . Verification of existing conditions before starting work . 5

Status
Closed
Sector
Oil and Gas, Road
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about Asphalt Services and Labor

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Asphalt Services and Labor” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Obtain materials from same source throughout each project . 2 . Abide by ADEM Requirements including all permits . 3 . Do not place asphalt when ambient air or base surface temperature is less than 40 degrees F , or surface is wet or frozen . 4 . Verification of existing conditions before starting work . 5 . Verify compacted subgrade subbase is dry and ready to support paving and imposed loads . 6 . Verify gradients and elevations of base are correct . 7 . Verify gutter drainage grilles and frames and manhole frames are installed in correct position and elevation . Raise to proper elevation if necessary . 8 . Apply tack coat in accordance with ALDOT Standard Specifications for Highway Construction . 9 . Apply tack coat to contact surfaces of curbs and gutters . 10 . Coat surfaces of catch basin frames with oil to prevent bond with asphalt pavement . Do not tack coats on these surfaces . 11 . Install work in accordance with ALDOT Standard Specifications for Highway Construction . 12 . Place asphalt within 24 hours of applying primer or tack coat . 13 . Place asphalt wearing course to thickness ( 1 ½ ” minimum ). 14 . Immediately after placement , protect pavement from mechanical injury until surface temperature is less than 140 degrees F . 15 . Immediately before placing asphalt materials , remove loose and deleterious material from substrate surfaces . Ensure that prepared subgrade is ready to receive paving . 16 . Spray , kill and remove all affected vegetation to ensure complete eradication per manufacturers specifications 7 - 10 days prior to paving . Use Garlon 3A or approved equal herbicide . Mix to the max ratio recommended by the manufacturer ( generally 1 % or greater ) and must use Garlon 3A or approved equal surfactant . Do not spray carelessly or in windy conditions . Must be sprayed when a 24hr window of clear dry weather is forecasted following treatment .

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Oil and Gas, Road

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender