logo

Athletics Phase 3

The scope, dates and status of this tender. A free account opens every field.

Source: MITN Purchasing Group

Tender
Closed

The Grosse Ile Township School ’ s Board of Education is accepting Sealed Bids to provide athletic renovations at Grosse Ile Middle School . Proposed work includes site work , drainage , concrete , synthetic turf , dugouts , fencing , scoreboards , and electrical as part of a General Contractor package . 4 . Provide and

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Steel, Education, Cement
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Athletics Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Athletics Phase 3” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Grosse Ile Township School ’ s Board of Education is accepting Sealed Bids to provide athletic renovations at Grosse Ile Middle School . Proposed work includes site work , drainage , concrete , synthetic turf , dugouts , fencing , scoreboards , and electrical as part of a General Contractor package . 4 . Provide and install complete soil erosion control measures , including required permits , regulatory performance bonds and weekly maintenance . Note : Strict enforcement of soil erosion control system maintenance is required as part of this project . Work includes maintenance of system during Construction , after each rain each . Contractor shall employ a Certified Stormwater Operator for system logs , removal of system at the completion of the project or until approved to remove by governing authorities . 5 . Furnish , install , maintain and remove all necessary shoring , bracing , fall protection , barricades , flashers , and other safety equipment in accordance with MIOSHA / OSHA rules and regulations as required for the performance of the work and safety of the workers . 6 . Contractor is responsible for scheduling all construction testing with Owner ’ s Independent Testing Agency as noted in Bid Documents and shall comply with all recommendations . 7 . Alternate No . 1 : furnish and install new 8 ’ x12 ’ pre - manufactured pressbox . Work includes but not limited to removal of existing pressbox , concrete flatwork , and fence & gate modifications . Refer to Electrical Drawings for all new work associated with Alternate Pressbox . 8 . Alternate No . 2 : furnish and install Black Vinyl Chainlink Fence at multi - purpose turf field and pond areas in lieu of Galvanized Chainlink Fence . 9 . Provide all labor and equipment necessary for the complete site demolition as shown within the Construction Limits unless specifically noted to be completed by others . Work includes but not limited to : concrete , asphalt , gravel , chainlink fence & bollards , soccer shelters & benches , adjustments to storm system as noted , irrigation , topsoil and unsuitable soil . Work includes removal and backfill of post footings as specified . 10 . Provide tree clearing and removal of all trees and shrubs , including root systems as noted . 11 . Remove and dispose of existing scoreboards , steel supports and concrete footings . 12 . Remove , salvage , and stockpile existing infield mix for re - use as base material on new fields . Contractor shall 13 . Provide labor , material and equipment necessary for disconnect and removal of electrical items as noted on drawings . Cut , cap , tag and make safe any existing electrical systems prior to any demolition . Properly identify and mark any system and its components that are to be removed by others . 14 . Provide and install any earthwork and engineered fill required for work of this category . Excavations must be compacted and ready to accept concrete . 15 . Provide necessary dewatering associated with this work division . 16 . Jet and vacuum all existing drainage structures within the project limits at project completion . 17 . Excavate topsoil as required . Contractors may elect to screen and stockpile topsoil onsite for reuse for lawn restoration . All excess topsoil and spoils shall be exported off site . Prepare site for proof - roll inspection on synthetic turf field and concrete flatwork areas and maintain positive drainage during all earthwork operations . 18 . Remove and legally dispose of all excess materials and debris generated by scope of work . 19 . Saw cut and remove existing asphalt and / or concrete paving as noted . 20 . Provide temporary pavement measures for vehicle or walkway traffic so as not to disrupt Owner operations . 21 . Provide all earthwork as shown unless specifically noted to be completed by others . Work includes but not limited to site balancing , rough grading , subgrade fine grading and finish grade fine grading . 22 . Adjust and repair all structures as shown and / or noted . Set structures for final paving / lawn elevations . 23 . Furnish and install new site utilities as shown . Work includes , but not limited to , perforated and solid wall draintile PVC pipe , HDPE pipe , concrete pipe , and new storm sewer system & structures as indicated . Work includes all backfill and tie - ins as noted on Drawings .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Steel, Education, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender