logo

ATR Ion Exchange Column Fabrication

Sector: Warehouse • Location: Idaho, United States of America

Source: Idaho Purchasing Group

Tender
Closed

INTRODUCTIONBattelle Energy Alliance , LLC ( BEA ) Management & Operating Contractor of the U . S . Department of Energy ( DOE ) owned Idaho National Laboratory ( INL ), is seeking an Expression of Interest ( EOI ) from qualified vendors capable of fabricating a complete Ion Exchange Column Assembly to support operations at

Status
Closed
Sector
Warehouse, Steel, Manufacturing (Industrial), Nuclear, Cement
Location
Idaho, United States of America
Updated
3 Nov 2026
Source
Idaho Purchasing Group

ConstructChat

Ask ConstructChat about ATR Ion Exchange Column Fabrication

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “ATR Ion Exchange Column Fabrication” is a tender record in Taiyo, linked to the Warehouse sector. It is issued for works, goods, or services related to Idaho, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

INTRODUCTIONBattelle Energy Alliance , LLC ( BEA ) Management & Operating Contractor of the U . S . Department of Energy ( DOE ) owned Idaho National Laboratory ( INL ), is seeking an Expression of Interest ( EOI ) from qualified vendors capable of fabricating a complete Ion Exchange Column Assembly to support operations at the Advanced Test Reactor ( ATR ). The fabricated system will play a critical role in radiochemical process performance , shielding effectiveness , and facility reliability . BACKGROUNDINL is a U . S . Department of Energy ( DOE ) national laboratory dedicated to nuclear energy , national security , and clean energy innovation . The ATR facility relies on highly specialized purification and shielding systems , which include the Ion Exchange Column Assembly . BEA is requesting vendor capabilities statements for the fabrication of a multi - component assembly that must meet strict nuclear , metallurgical , and structural performance standards . Project - specific INL engineering reports , detailed drawings , structural analyses , and procedural references will be furnished . The scope of work includes the following : Fabrication of one complete Ion Exchange Column Assembly , including : Two stainless steel ion exchange columnsShield boxAccess port coversLead shot shielding materialAll mounting hardware and handling hardware following detailed drawings and engineering reportsDevelopment of procedures for lead - shot and rigging handling of the completed assemblyThe scope of workdoes notinclude the following : Installation at the facilityInterfacing equipment beyond supplied mounting hardwareOverpressure protection of the final assemblyAPPLICABLE CODES AND REFERENCESThe fabrication and associated documentation must comply with the following ( as applicable to component type ): ASME Section VIII Division 1 ( 2023 ) ACI 349 - 13 ( Reinforced Concrete Safety - Related Structures ) ANSI / AISC N690 - 18 ( Nuclear Facility Steel Structures ) ASCE 4 - 16 and ASCE 43 - 19 ( Seismic Design ) ANS - 2 . 26 ( Seismic Categorization ) DESIGN REQUIREMENTSVendors should have demonstrated experience with nuclear - grade fabrication and must meet or exceed the following design conditions : Materials & Components : Stainless steel process vesselsLead - shot - filled shielding support frameStructural framing and supports per AISC nuclear standardsPressure & Temperature Ratings : Design Pressure : 2500 psigTemperature Range : - 20 ° F to 650 ° FRadiation Shielding : Assembly must reduce radiation fields to below 100 mRem / hr at 30 cmSeismic Requirements : Seismic Design Category : SDC - 4Design consistent with ASCE 4 - 16 , ASCE 43 - 19 , ANS - 2 . 26Inspections & Engineering Approval : All pressure boundary welds inspected per ASME VIII / NDE requirementsFabrication drawings and calculations must be submitted for formal BEA review / approvalPROCESSThis EOI is the first step in identifying interested and qualified vendors . Responses may be used to inform the development of a formal solicitation list . Selected vendors may be invited to participate in a Request for Proposal ( RFP ) process for award consideration . SUBMITTAL REQUIREMENTSInterested vendors should submit an Expression of Interest that includes the following : Company name and point of contactRelevant fabrication experience , particularly nuclear or DOE - grade workApplicable NAICS codes and business size classificationAny existing DOE or federal contracting experience ( if applicable ) Demonstrated capability to meet ASME , AISC , seismic , and shielding requirementsAcknowledgment of the ability to meet the following vendor data submittals : Fabrication drawings and bill of materialsDesign calculations ( structural , seismic , pressure ) Material test reports ( MTRs ) Weld maps and WPS / PQR documentationNDE reports and inspection recordsHydrostatic test procedures and final test reportsPackaging , handling , and lead - shot management proceduresSoftware verification documentation ( if engineering software is used ) Completed Vendor Data Schedule and transmittal formsQUALITY ASSURANCE REQUIREMENTSThe subcontractor ’ s quality program must be equivalent to ASME NQA - 1 . Requirements include : Qualification records for welders , inspectors , techniciansThird - party inspection where requiredPressure vessel registration ( if applicable ) Certificates of Conformance ( CoC ) Submittal of all quality - related inspection and test documentsFABRICATION & TESTINGMaterials must meet applicable ASME and ASTM specificationsFabrication must follow ASME Section VIII and ANSI / AISC N690 - 18 for structural partsAll surfaces cleaned and finished uniformly ; stainless surfaces must meet chloride and contamination requirementsIdentification tags and ASME nameplates applied as requiredHydrostatic testing must meet ASME VIII requirements , using low - chloride test fluidBEA inspectors may witness fabrication and testing activitiesA “ U ” stamp certification of the vesselsDELIVERY & PROTECTIONFinal assembly must be delivered to a specified Idaho Falls logistics facility with : Cleanliness requirements met ; no fluids or contaminants left inside componentsProtective packaging to prevent component damageClear labeling and lift / rigging points identifiedUnit prepared for forklift or crane handlingINL personnel retain rights for inspections , audits , and hold - point reviews throughout fabrication . Final acceptance occurs after successful hydrostatic testing , inspection , and delivery to an Idaho Falls logistics facilityDeadline for submission : April 22 , 2026Submit to : Chase . Egbert @ inl . govOnly select respondents , as determined by BEA , will receive an invitation to participate in the anticipated RFP solicitation . PROPRIETARY INFORMATIONBecause information received in response to this EOI may be business sensitive or proprietary to the responding party , respondents must mark information in their responses accordingly .

Location

Country

United States of America (USA)

State

Idaho

Source

Source

Idaho Purchasing Group

URL

More Details

Record type

Tender

Sector

Warehouse, Steel, Manufacturing (Industrial), Nuclear, Cement

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender