logo

Automatic Engine Start Stop (Aess) Continuation And Air Leak Fuel Penalty Study

One of 10,000+ tenders Taiyo tracks in Texas.

Source: SAM.gov

Tender
Special Notice

FR26RDI20000000033 - NOTICE OF INTENT TO AWARD A SOLE SOURCE CONTRACT THIS IS A NOTICE OF INTENT (NOI) TO AWARD A SOLE SOURCE CONTRACT AND IS NOT A REQUEST FOR COMPETITIVE PROPOSALS. The Federal Railroad Administration (FRA) intends to award a sole-source contract to Southwest Research Institute to identify the fuel and emissions penalty of the Automatic Engine Start Stop (AESS) system not being a

Status
Prospective
Sector
Water Supply and Storage, Rail, Commercial, Residential
Location
San Antonio, Texas, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Automatic Engine Start Stop (Aess) Continuation And Air Leak Fuel Penalty Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Automatic Engine Start Stop (Aess) Continuation And Air Leak Fuel Penalty Study” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to San Antonio, Texas, United States of America.

Participants

Not available for this record.

Status

Original status

special notice

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

FR26RDI20000000033 - NOTICE OF INTENT TO AWARD A SOLE SOURCE CONTRACT THIS IS A NOTICE OF INTENT (NOI) TO AWARD A SOLE SOURCE CONTRACT AND IS NOT A REQUEST FOR COMPETITIVE PROPOSALS. The Federal Railroad Administration (FRA) intends to award a sole-source contract to Southwest Research Institute to identify the fuel and emissions penalty of the Automatic Engine Start Stop (AESS) system not being able to keep the locomotive shutdown due to air leaks. This is in addition to the available information on the fuel consumption and emissions penalty associated with the addition of a simulated break pipe air leak of 30 and 60 Standard Cubic Foot per Minute (SCFM) as a follow-on requirement to continue work previously performed by Southwest Research Institute under Contract No. (693JJ623C000028) during the base performance period. The previous contract only identified the fuel penalties associated with the line haul and switcher duty cycles during continuous operation but did not identify the penalty associated with the additional time that the Locomotive Automatic Engine Start Stop (AESS) system needs to operate the engine to maintain the air pressure in the Main Reservoir (MR). AUTHORITY This sole source action is conducted under the authority of FAR 6.302?1, implemented by 41 U.S.C. § 3304(a)(1), Only One Responsible Source.” No solicitation or request for quote is available. PERIOD OF PERFORMANCE June 30, 2026 - June 29, 2028 RESPONSE INSTRUCTIONS This Notice of Intent is not a request for competitive proposals; however, interested parties may submit a capability statement that clearly demonstrates the ability to perform the Automatic Engine Start Stop (AESS) continuation and Air Leak Fuel Penalty Study without disruption, duplication of cost, or loss of program continuity. Capability statements must be received no later than 15 calendar days from the date of posting, by 2:00 PM Eastern Time. Oral communication will not be accepted.

Original sector

Professional, Scientific, and Technical Services

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Rail, Commercial, Residential

Article published date

2026-04-24

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender