Automatic Transfer Switch ( ATS ) Replacement at the Elm Point Water Treatment Plant

One of 10,000+ tenders Taiyo tracks in Missouri.

Source: Missouri Purchasing Group

Tender
Closed

Automatic Transfer Switch ( ATS ) Replacement at Elm Point Water Treatment Plant I . Scope of Services A . GENERAL CONDITIONS 1 . General It is the intent of these specifications to describe the minimum level of service required . This work shall consist of furnishing equipment , materials , fuel , labor , and all

Status
Closed
Sector
Road, Water Supply and Storage, Cement
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Automatic Transfer Switch ( ATS ) Replacement at the Elm Point Water Treatment Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Automatic Transfer Switch ( ATS ) Replacement at the Elm Point Water Treatment Plant” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Automatic Transfer Switch ( ATS ) Replacement at Elm Point Water Treatment Plant I . Scope of Services A . GENERAL CONDITIONS 1 . General It is the intent of these specifications to describe the minimum level of service required . This work shall consist of furnishing equipment , materials , fuel , labor , and all other incidental items needed to perform Automatic Transfer Switch ( ATS ) Replacement at the Elm Point Water Treatment Plant . 2 . Safety a . Appropriate traffic - control signs shall be used when working within any street right - of - way . b . Reasonable care shall be taken when working in the vicinity of other people and / or property . c . Any and all accidents ( both personal injury and property damage ) are to be reported to the appropriate City staff as soon as possible . 3 . General / Miscellaneous a . The Bidder shall provide supervision of all work crews at all times while performing work under this contract . Personnel supervision is not required provided that equipment or other means are provided that enable the work crew to communicate with the contractor at all times . b . Work crews shall wear shirts and generally maintain a well - kept appearance during work activities . B . SPECIFICATIONS 1 . The Contractor is responsible for procuring and installing two ( 2 ) automatic transfer switches in accordance with the attached technical specification . 2 . The Contractor shall submit all information as required per the attached technical specification to the Owner for review and approval prior to ordering equipment . The drawings attached to this bid are provided for information only , intended to provide site information and outline the anticipated phasing for installation . 3 . Contractor shall verify that the replacement switches will fit within the existing space . The existing equipment pad shall be utilized for placement of the new switches . The existing ATS enclosures are 32 - inches wide x 38 - inches deep x 91 . 5 - inches high each , both installed on a concrete equipment pad measuring 81 - inches wide x 39 - inches deep . If the new equipment cannot be sized to fit within the existing pad footprint , consideration may be given to extending the equipment pad . Available space is limited and the Contractor will be responsible for extending the equipment pad as necessary , revising enclosure anchorage as required , and relocation of any existing equipment in conflict , while ensuring compliance with all applicable codes . 4 . Contractor shall plan to perform the work between October 15 and April 15 when water demand is lower . The Contractor shall submit to the Owner for approval prior to construction , a proposed phasing plan for installation that minimizes water plant operations downtime . The Contractor must coordinate all installation activities with plant operations personnel . 5 . Contractor shall replace one ATS at a time . When ATS - MCCA is removed , a temporary feeder shall be provided from the output of ATS - MCCB to MCCA . The temporary feeder shall be removed when the new ATS - MCCA is connected . When ATS - MCCB is removed , a temporary feeder shall be provided from the output of ATSMCCA to MCCB , and removed when ATS - MCCB is connected .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender