Avenue B Reconstruction Phase 2; PW26-13
Issued · Iowa
Source: City of Council Bluffs
The City of Council Bluffs Public Works Engineering Division is requesting bids for all work set forth in the plans, specifications, and proposals for this project.Major items of workfor this project include the following approximate quantities:Pavement, PCC, 8 Inch, CV-SUD-C15 2,915.50 SYSubbase, Granular, 6 Inch 3,261.70 SYSidewalk, PCC, 4 Inch 687.10 SYStorm Sewer, Trenched, Class IV, 15 Inch 1
- Status
- Bidding
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Council Bluffs, Iowa, United States of America
- Updated
- 3 Nov 2026
- Source
- City of Council Bluffs
ConstructChat
Ask ConstructChat about Avenue B Reconstruction Phase 2; PW26-13
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | issued |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Council Bluffs Public Works Engineering Division is requesting bids for all work set forth in the plans, specifications, and proposals for this project.Major items of workfor this project include the following approximate quantities:Pavement, PCC, 8 Inch, CV-SUD-C15 2,915.50 SYSubbase, Granular, 6 Inch 3,261.70 SYSidewalk, PCC, 4 Inch 687.10 SYStorm Sewer, Trenched, Class IV, 15 Inch 191 LFStorm Sewer, Trenched, RCP Class III, 15 Inch 273 LFStorm Sewer, Trenched, RCP, Class III, 18 Inch 84 LFStorm Sewer, Trenched, RCP Class III, 24 Inch 267 LFStorm Sewer Manholes 1 EAStorm Sewer Intakes 10 EASanitary Sewer Gravity Main, Trenched, PVC SDR-35, 15 Inch 695 LFSanitary Sewer Manholes 4 EAAll work is to be completed on or before July 9, 2027.Work shall not begin prior to August 10, 2026. Work from station 113+90.00 to station 117+71.26 shall be completed by November 13, 2026. If work remains in Stage 1A, all work within that stage shall be completed within 10 weeks of mobilization in 2027. Work within Stage1B shall be completed within 30 calendar days of beginning work in that stage and shall be completed on or before July 9, 2027.The City of Council Bluffs will accept electronic bid submittals in IonWave until the date and time listed for this solicitation. Hard copy bid submittals are not acceptable and will not be considered. Any bid submitted after the deadline will be automatically rejected.Each respondent is responsible for taking the necessary steps to ensure their submission is received and complete by the listed deadline. Incomplete submissions are automatically rejected. The City is not responsible for technical difficulties and will not allow late submissions due to the same. |
Location
Country | United States of America (USA) |
State | Iowa |
City | Council Bluffs |
Source
Source | City of Council Bluffs |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
