logo

B Lock Penstocks Replacement

The scope, dates and status of this tender. A free account opens every field.

Source: Contracts Finder

Tender
Opportunity

KBS Maritime have a requirement for penstock replacements at B Lock within Portsmouth Naval Base. The project consists of 10 in number replacement penstocks in 6 chambers overall. The penstock system controls sea water via a culvert system between the harbour, the basin and the dry docks. These include levelling penstocks of circa 8 metres deep to drainage penstocks circa 18 metres deep. The repla

Status
Prospective
Sector
Water Supply and Storage, Seaport, Manufacturing (Industrial), Commercial, Road
Location
United Kingdom
Updated
3 Nov 2026
Source
Contracts Finder

ConstructChat

Ask ConstructChat about B Lock Penstocks Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “B Lock Penstocks Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

opportunity

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

KBS Maritime have a requirement for penstock replacements at B Lock within Portsmouth Naval Base. The project consists of 10 in number replacement penstocks in 6 chambers overall. The penstock system controls sea water via a culvert system between the harbour, the basin and the dry docks. These include levelling penstocks of circa 8 metres deep to drainage penstocks circa 18 metres deep. The replacement programme will replace the current cast irons doors with new with specification to be agreed along with the associated shafts, wedges, door nut, brackets, platforms, ladders and actuation and road plates. This project is due to commence in Q4 2026 with all to be replaced by Feb 2030. Contractors must be able to demonstrate design, manufacture and installation of penstock replacements in a marine environment including all site management under CDM regulations and competency of Health and Safety compliance and safe practices. Contractors must also possess at least five years' experience working within a marine environment. Contractors who do not provide suitable and sufficient evidence of this will not be considered

Location

Country

United Kingdom (UK)

Source

Source

Contracts Finder

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Seaport, Manufacturing (Industrial), Commercial, Road

Article published date

2026-05-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender