logo

B1130 Roof Replacement

Sector: Water Supply and Storage • Location: Sumter, South Carolina, United States of America

Source: SAM.gov

Tender
Sources Sought
  1. Description: This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB. The contractor shall provide all design, engineeri
Status
Closed
Sector
Water Supply and Storage, Cement, Metal, Aerospace & Defense, Residential, Commercial, Government
Location
Sumter, South Carolina, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about B1130 Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “B1130 Roof Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Sumter, South Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

sources sought

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1. Description: This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB. The contractor shall provide all design, engineering, labor, materials, equipment, and supervision necessary to: a) Completely demolish the existing roofing system down to the structural concrete deck to include the elevator shaft roof. b) Repair the spalls and cracks on the existing concrete deck. Prepare the concrete deck with a new air & vapor barrier and insulation board for a standing seam metal roofing retro fit/hugger system. c) Design and install a new, fully compliant, Single Sloped Hydrostatic Standing Seam Metal Roofing hugger system incorporating an adequate slope to ensure positive water drainage/flow. The slope of the new SSMR will be directed to the back of the building. The height of the new SSMR must not be higher than the existing front building’s parapet wall height primarily to maintain the overall aesthetic of the building’s front. Demolish all parapet wall in the rear building area to incorporate a new external drainage system at the rear of the building. All existing drainage and appurtenances of the building is to be sealed and removed. d) Design and install a new, 2-ply, cold-applied SBS Modified Bitumen roofing system, complete with new insulation for the elevator shaft. The system shall be drained via new scuppers designed to discharge water onto the new main standing seam metal roof. e) Engineer and execute a comprehensive redesign of the drainage system, demolishing the 25 existing internal drains, in its entirety. The new external drainage system will be located at the back of the building. The sizing of the gutters, downspouts and tie-in locations to the storm drains must be designed to handle the massive volume and velocity of water from a 100-year storm event impacting the entirety of the new roof. f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc). g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft. h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly. i) Install a new Horizontal Lifeline System / Fall Protection System. j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications. k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility. 2. Submission Requirements: Interested vendors are invited to submit the following information: Company Information Company name, address, and point of contact (name, email, phone) CAGE code and UEI (if available) Applicable NAICS codes Capabilities Statement Description of your ability to fulfill the listed requirements in the Statement of Work Indicate your ability to perform at Shaw, AFB. 3. Submission Instructions: Response Deadline: 13 March 2026, 4:00 PM EST Submission Method: Email responses to hutton.cobb@us.af.mil Subject Line: Sources Sought Response - B1130 Roof Replacement. Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.

Original sector

Construction

Location

Country

United States of America (USA)

State

South Carolina

City

Sumter

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Cement, Metal, Aerospace & Defense, Residential, Commercial, Government

Article published date

2026-03-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender