BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Contract notice · Norway · Last reported Jun 2026
Source: TED Europa
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik.
Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed. |
Original sector | Construction work, Construction work, Construction work, Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction work, Construction work, Construction work, Construction work, Construction work |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in Norway
- Disposal and handling of waste
- Transport and treatment of wood SUM
- Water and sewage - Project and other municipal engineering work - framework agreement.
- Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
- Drainage measures Innlandet Øst, Røros-, Solør- and Kongsvingerbanen 2026
- Gammelosen Treatment Facility - Turnkey Contract Building
- Receipt and treatment of waste from the Environmental Squares - IRIS
- Monitoring migratory birds 2026-2030
