Backup Consumables Transportation Services
Sector: Bridge • Location: California, United States of America
Source: California Purchasing Group
1 . Contractor agrees to provide the California Correctional Training and Rehabilitation Authority ( CALCTRA ) with backup consumable transportation services on predetermined routes within California as listed on the Cost Sheets for Established Delivery Routes ( Attachment 3A - 3C ), which may include minor modifications to
- Status
- Closed
- Sector
- Bridge, Car parking, Automotive
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Backup Consumables Transportation Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Contractor agrees to provide the California Correctional Training and Rehabilitation Authority ( CALCTRA ) with backup consumable transportation services on predetermined routes within California as listed on the Cost Sheets for Established Delivery Routes ( Attachment 3A - 3C ), which may include minor modifications to the predetermined routes . In addition , Contractor may be requested to provide transportation services based on rate per mile per pound as outlined on Cost Sheets for Alternate Delivery Routes ( Attachment 3D - 3F ). A . The Contractor shall furnish all labor , including but not limited to loading and unloading of trailers , travel and per diem , materials , non - consumable supplies , transportation , parking fees and bridge tolls , insurance , equipment and every other item of expense necessary to perform services . i . Contractor and staff utilized by Contractor to complete these services shall conduct business in a professional and respectful manner , including contacting CALCTRA ’ s designee to assist resolving customer concerns . All agree to abide by the Appropriate Attire Policy ( Attachment 9 ). ii . No subcontracting will be permitted . iii . Contractor will ensure proper securing of the load ( s ). iv . No monetary compensation will be made for standby , spotting , or staging time unless authorized by CALCTRA On Time Delivery ( OTD ) Project Representative , or designee , in advance . Contractor is expected to report any delays to the OTD Project Representative , or designee , for resolution . v . Contractor is responsible for all damage to CALCTRA equipment and customer products during shipment , in - transit storage , and delivery , as well as any damage to customer buildings , which includes walls and floors , incurred when performing contracted services . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Car parking, Automotive |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
