Baldwin County Golf Course Construction
Location: Georgia, United States of America
Source: Georgia Purchasing Group
1 . 0 Shaping 1 . 1 Contractor shall be responsible for the layout and staking of all golf course features ( tees , greens , sand bunkers , grass hollows , mounds , rolls , terraces , etc .) according to the locations , dimensions , and elevations as directed in the field by the Golf Course Architect . The shaping on
- Status
- Closed
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Baldwin County Golf Course Construction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . 0 Shaping 1 . 1 Contractor shall be responsible for the layout and staking of all golf course features ( tees , greens , sand bunkers , grass hollows , mounds , rolls , terraces , etc .) according to the locations , dimensions , and elevations as directed in the field by the Golf Course Architect . The shaping on this project will consist of a maximum of 10 acres of recontouring of fairway surface or tee plus all 18 green complexes . 1 . 2 Golf Course Architect reserves the right to modify the shapes , the locations , and / or the elevations of the golf course features to improve the aesthetic appeal , the playability , or the relationship of proposed shapes to surrounding environment . 1 . 3 The shaping of golf course features shall be accomplished by bulldozer , tractor , or other similar type equipment . The person doing the actual shaping must be approved by the architect . 1 . 4 Golf Course Architect shall approve the fine shaping prior to preparing the seedbed for planting . SHAPING FEE_________________ 2 . 0 Tee Construction 2 . 1 Contractor shall construct the tees at the locations , dimensions . and elevations as directed by the Golf Course Architect . 2 . 2 Tee surfaces shall be constructed to provide adequate surface drainage . Tee surfaces shall slope one ( 1 ) percent from front to back , one ( 1 ) percent from right to left , or one ( 1 ) percent in a direction as dictated by the topography . 3 . 0 Bunker Construction 3 . 1 Contractor shall construct bunkers at the locations , dimensions , and elevations as directed by the Golf Course Architect . 3 . 2 Contractor shall cut out the bottoms of all bunkers in a concave manner to insure all surface drainage falls away from the edge of the bunker , in a manner which limits the erosion of sand , has a smooth finish , and is cleaned of all debris or excess soil material . 3 . 3 Contractor shall shape swales adjacent to the bunker complex at the direction of the Golf Course Architect to promote positive surface drainage and protect the bunker complex from erosion damage . 3 . 4 Golf Course Architect shall approve the bunker outline prior to edging the lip of the bunker . 3 . 5 Contractor shall install subsurface drainage as marked by the architect 3 . 6 Contractor shall be responsible for installing at each bunker an outfall ( 4 " Solid Drainage Pipe - ADS or approved equal ) for the subsurface drainage . Contractor shall connect the outfall to the drainage system or terminate the outfall at lakes , creeks , or other non - play areas . SAND BUNKER CONSTRUCTION FEE APPROXIMATELY 25 , 000 SQUARE FEET OF SAND BUNKER |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
