Ball Field Infield Renovation Bid
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
Remove all existing bases , plates , rubbers , and plugs Identify all pre - existing grades and conditions Consider the area of work to be all clay playing surfaces and extending 15 ' beyond the infield clay into the outfield grass area to regrade the lip and reestablish an accurate grass arch Undercut exis
- Status
- Closed
- Sector
- Water Supply and Storage, Residential
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Ball Field Infield Renovation Bid
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Remove all existing bases , plates , rubbers , and plugs Identify all pre - existing grades and conditions Consider the area of work to be all clay playing surfaces and extending 15 ' beyond the infield clay into the outfield grass area to regrade the lip and reestablish an accurate grass arch Undercut existing playing surface and 15 ' into outfield grass and dispose of unnecessary materials to account for 4 " imported engineered infield clay Laser grade existing playing surface material and 15 ' into outfield grass to shed water to the low point on each field before placing overseeded 419 Bermuda sod and 4 " imported engineered infield clay Laser grade 4 " imported engineered infield clay , compact upon approval and completion ( consider low points on dugout entries when establishing subgrade and final grade points ) Install overseeded 419 Bermuda sod in a 15 ' lip arch and establish proper arch dimension and shape , using large rolls , machine laid , no pallet squares or mini rolls will be accepted Install Dura Edge ProLoc Mound Blocks in batter ’ s boxes and catcher ’ s box should be 4 ” deep ( each batter ' s box is 7 ’ x3 ’ and catcher ’ s box is 5 ’ x5 ’). Leave extra blocks for later repairs . Apply 3 / 16 " Dura Edge ProSlide Professional Red Infield Top Dressing Conditioner , after final grade has been approved and inspected , compact upon approval and completion Install 60 ' ( on both fields ), 70 ' ( on both fields ), and 80 ’ ( on C & H Field only ) base plugs and new home plates Include irrigation repair budget to modify head placement and height as necessary , as grade changes through the process . Irrigation budget will be a lump sum on an as - needed basis Set up the Irrigation run schedule and ensure its proper function to establish new sod before the Spring sports season Repair any field damage caused by your company during the renovations . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
